語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Construction scheduling, cost optimi...
~
Karim, Asim Salimul, (1971-)
FindBook
Google Book
Amazon
博客來
Construction scheduling, cost optimization, and management = a new model based on neurocomputing and object technologies /
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Construction scheduling, cost optimization, and management/ Hojjat Adeli, Asim Karim.
其他題名:
a new model based on neurocomputing and object technologies /
作者:
Adeli, Hojjat,
其他作者:
Karim, Asim Salimul,
出版者:
London ;Spon Press, : 2001.,
面頁冊數:
xvi, 320 p. :ill. ;25 cm.
標題:
Building - Cost control. -
電子資源:
http://www.netLibrary.com/urlapi.asp?action=summary&v=1&bookid=94057An electronic book accessible through the World Wide Web; click for information
ISBN:
0203302230 (electronic bk.)
Construction scheduling, cost optimization, and management = a new model based on neurocomputing and object technologies /
Adeli, Hojjat,1950-
Construction scheduling, cost optimization, and management
a new model based on neurocomputing and object technologies /[electronic resource] :Hojjat Adeli, Asim Karim. - London ;Spon Press,2001. - xvi, 320 p. :ill. ;25 cm.
Includes bibliographical references (p. 289-313) and index.
Electronic reproduction.
Boulder, Colo. :
NetLibrary,
2004.
Available via World Wide Web.
ISBN: 0203302230 (electronic bk.)Subjects--Topical Terms:
660302
Building
--Cost control.Index Terms--Genre/Form:
542853
Electronic books.
LC Class. No.: TH438.4 / .A33 2001eb
Dewey Class. No.: 624/.068
Construction scheduling, cost optimization, and management = a new model based on neurocomputing and object technologies /
LDR
:01167cam a2200241 a 45
001
749240
003
OCoLC
005
20071228
006
m d
007
cr cnu---unuuu
008
071228s2001 enka sb 001 0 eng d
020
$a
0203302230 (electronic bk.)
035
$a
ocm56938258
040
$a
N
$c
N
$d
OCLCQ
049
$a
AMFA
050
1 4
$a
TH438.4
$b
.A33 2001eb
082
0 4
$a
624/.068
$2
22
100
$a
Adeli, Hojjat,
$d
1950-
$3
663194
245
1 0
$a
Construction scheduling, cost optimization, and management
$h
[electronic resource] :
$b
a new model based on neurocomputing and object technologies /
$c
Hojjat Adeli, Asim Karim.
260
$a
London ;
$a
New York :
$c
2001.
$b
Spon Press,
300
$a
xvi, 320 p. :
$b
ill. ;
$c
25 cm.
504
$a
Includes bibliographical references (p. 289-313) and index.
533
$a
Electronic reproduction.
$b
Boulder, Colo. :
$c
NetLibrary,
$d
2004.
$n
Available via World Wide Web.
$n
Access may be limited to NetLibrary affiliated libraries.
$n
"This edition published in the Taylor & Francis e-Library, 2004."
650
$a
Building
$x
Cost control.
$3
660302
650
$a
Construction industry
$x
Management.
$3
657304
650
$a
Production scheduling.
$3
680857
650
$a
GERENCIAMENTO DA CONSTRU瓁裬O.
$2
larpcal
$3
862111
655
$a
Electronic books.
$2
lcsh
$3
542853
700
$a
Karim, Asim Salimul,
$d
1971-
$3
862110
710
$a
NetLibrary, Inc.
$3
542851
856
4 0
$3
Bibliographic record display
$u
http://www.netLibrary.com/urlapi.asp?action=summary&v=1&bookid=94057
$z
An electronic book accessible through the World Wide Web; click for information
994
$a
92
$b
AMF
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9019141
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入