Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Force majeure in the hydropower indu...
~
Diaconu, Daniel Constantin.
Linked to FindBook
Google Book
Amazon
博客來
Force majeure in the hydropower industry = concepts and case studies /
Record Type:
Electronic resources : Monograph/item
Title/Author:
Force majeure in the hydropower industry/ by Daniel Constantin Diaconu.
Reminder of title:
concepts and case studies /
Author:
Diaconu, Daniel Constantin.
Published:
Cham :Springer International Publishing : : 2023.,
Description:
xi, 156 p. :ill. (chiefly col.), digital ;24 cm.
[NT 15003449]:
Chapter 1 Introduction -- Chapter 2 Water for energy versus energy for water -- Chapter 3. Energy sectors that use water -- Chapter 4. The context of the development of the World hydropower sector -- Chapter 5. The impact of drought on the hydropower domain -- Chapter 6. Force majeure -- Chapter 7. Sample contractual provisions, which must be contained in a force majeure contract -- Chapter 8. Concrete cases of invocation of force majeure -- Chapter 9. Romania, in a European energy context -- Chapter 10. Settlement of the dispute, in case the force majeure clause is invoked by Hidroelectrica SA -- Chapter 11. Electricity, systemic crises and environmental policies.
Contained By:
Springer Nature eBook
Subject:
Water-power - Law and legislation. -
Online resource:
https://doi.org/10.1007/978-3-031-27402-2
ISBN:
9783031274022
Force majeure in the hydropower industry = concepts and case studies /
Diaconu, Daniel Constantin.
Force majeure in the hydropower industry
concepts and case studies /[electronic resource] :by Daniel Constantin Diaconu. - Cham :Springer International Publishing :2023. - xi, 156 p. :ill. (chiefly col.), digital ;24 cm.
Chapter 1 Introduction -- Chapter 2 Water for energy versus energy for water -- Chapter 3. Energy sectors that use water -- Chapter 4. The context of the development of the World hydropower sector -- Chapter 5. The impact of drought on the hydropower domain -- Chapter 6. Force majeure -- Chapter 7. Sample contractual provisions, which must be contained in a force majeure contract -- Chapter 8. Concrete cases of invocation of force majeure -- Chapter 9. Romania, in a European energy context -- Chapter 10. Settlement of the dispute, in case the force majeure clause is invoked by Hidroelectrica SA -- Chapter 11. Electricity, systemic crises and environmental policies.
This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The first part of this book will be an analysis of how water is used in electricity production. It is important to point out that all types of energy sources use water, to a different extent, of course, and that its spatial and temporal availability is very important. The focus will be on hydropower, presenting the current situation at the global level, and the effect of reducing the amounts of water in the river system. The second part is based on the presentation of the concept of force majeure and the ways of presenting and drafting it in a contract. Many disputes or the success of a contract depended heavily on the provisions of this article of the contract. Obviously, there are also situations in which the signatory parties abuse or are not protected by these provisions of force majeure. Starting from a few brief examples from the international level, we reach a wide discussion of the situation created in Romania, when the largest supplier of electricity produced on the basis of water terminates several contracts invoking force majeure. The manner in which the opinion of the parties involved is presented to the court is analyzed and presented in detail.
ISBN: 9783031274022
Standard No.: 10.1007/978-3-031-27402-2doiSubjects--Topical Terms:
3631084
Water-power
--Law and legislation.
LC Class. No.: K3982 / .D53 2023
Dewey Class. No.: 343.0929
Force majeure in the hydropower industry = concepts and case studies /
LDR
:03040nmm a2200325 a 4500
001
2317176
003
DE-He213
005
20230322144733.0
006
m d
007
cr nn 008maaau
008
230902s2023 sz s 0 eng d
020
$a
9783031274022
$q
(electronic bk.)
020
$a
9783031274015
$q
(paper)
024
7
$a
10.1007/978-3-031-27402-2
$2
doi
035
$a
978-3-031-27402-2
040
$a
GP
$c
GP
041
0
$a
eng
050
4
$a
K3982
$b
.D53 2023
072
7
$a
RBK
$2
bicssc
072
7
$a
SCI081000
$2
bisacsh
072
7
$a
RBK
$2
thema
082
0 4
$a
343.0929
$2
23
090
$a
K3982
$b
.D536 2023
100
1
$a
Diaconu, Daniel Constantin.
$3
3459117
245
1 0
$a
Force majeure in the hydropower industry
$h
[electronic resource] :
$b
concepts and case studies /
$c
by Daniel Constantin Diaconu.
260
$a
Cham :
$b
Springer International Publishing :
$b
Imprint: Springer,
$c
2023.
300
$a
xi, 156 p. :
$b
ill. (chiefly col.), digital ;
$c
24 cm.
505
0
$a
Chapter 1 Introduction -- Chapter 2 Water for energy versus energy for water -- Chapter 3. Energy sectors that use water -- Chapter 4. The context of the development of the World hydropower sector -- Chapter 5. The impact of drought on the hydropower domain -- Chapter 6. Force majeure -- Chapter 7. Sample contractual provisions, which must be contained in a force majeure contract -- Chapter 8. Concrete cases of invocation of force majeure -- Chapter 9. Romania, in a European energy context -- Chapter 10. Settlement of the dispute, in case the force majeure clause is invoked by Hidroelectrica SA -- Chapter 11. Electricity, systemic crises and environmental policies.
520
$a
This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The first part of this book will be an analysis of how water is used in electricity production. It is important to point out that all types of energy sources use water, to a different extent, of course, and that its spatial and temporal availability is very important. The focus will be on hydropower, presenting the current situation at the global level, and the effect of reducing the amounts of water in the river system. The second part is based on the presentation of the concept of force majeure and the ways of presenting and drafting it in a contract. Many disputes or the success of a contract depended heavily on the provisions of this article of the contract. Obviously, there are also situations in which the signatory parties abuse or are not protected by these provisions of force majeure. Starting from a few brief examples from the international level, we reach a wide discussion of the situation created in Romania, when the largest supplier of electricity produced on the basis of water terminates several contracts invoking force majeure. The manner in which the opinion of the parties involved is presented to the court is analyzed and presented in detail.
650
0
$a
Water-power
$x
Law and legislation.
$3
3631084
650
0
$a
Electric power production
$x
Law and legislation.
$3
3631085
650
0
$a
Vis major (Civil law)
$3
3631086
650
1 4
$a
Water.
$3
516619
650
2 4
$a
Hydroenergy.
$3
3592798
650
2 4
$a
Environmental Law.
$3
676816
650
2 4
$a
Environmental Sciences.
$3
676987
650
2 4
$a
Earth Sciences.
$3
642591
710
2
$a
SpringerLink (Online service)
$3
836513
773
0
$t
Springer Nature eBook
856
4 0
$u
https://doi.org/10.1007/978-3-031-27402-2
950
$a
Earth and Environmental Science (SpringerNature-11646)
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9453426
電子資源
11.線上閱覽_V
電子書
EB K3982 .D53 2023
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login