語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Decision-Making in Reuse of Highway ...
~
Hoomaan, Ehssan.
FindBook
Google Book
Amazon
博客來
Decision-Making in Reuse of Highway Bridge Foundations.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Decision-Making in Reuse of Highway Bridge Foundations./
作者:
Hoomaan, Ehssan.
出版者:
Ann Arbor : ProQuest Dissertations & Theses, : 2020,
面頁冊數:
207 p.
附註:
Source: Dissertations Abstracts International, Volume: 82-04, Section: B.
Contained By:
Dissertations Abstracts International82-04B.
標題:
Industrial arts education. -
電子資源:
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=28091626
ISBN:
9798672190587
Decision-Making in Reuse of Highway Bridge Foundations.
Hoomaan, Ehssan.
Decision-Making in Reuse of Highway Bridge Foundations.
- Ann Arbor : ProQuest Dissertations & Theses, 2020 - 207 p.
Source: Dissertations Abstracts International, Volume: 82-04, Section: B.
Thesis (Ph.D.)--The City College of New York, 2020.
This item must not be sold to any third party vendors.
According to the 2019 National Bridge Inventory data from Federal Highway Administration, the average age of highway bridges in the U.S.A. is 45 years, with almost 43% of existing highway bridges being older than 50 years, and eight percent of all U.S. national highway bridges being in poor condition. Foundation and substructure of existing highway bridges (over land and water) may have significant functional values even after being under service for decades. Reusing an existing bridge foundation during the reconstruction of a bridge (e.g., major rehabilitation, retrofitting, replacement of superstructure and substructure, and addition/removal of a span) has the potential for significant savings on total cost and construction time. However, because of uncertainties in the evaluation of integrity, durability, and load-carrying capacity of an existing foundation, an inevitable level of risk is inherently associated with their reuse. This risk may weigh on potential benefits of reuse of a bridge foundation during the decision making. Therefore, developing a comprehensive framework and procedure for studying the feasibility of foundation reuse is an important step in the foundation reuse decision process. In particular, bridge owners need to have an estimation of various risks associated with available options during a reconstruction project (i.e., fully reuse, partial reuse, and no- reuse). In this dissertation, a decision-making framework is developed to evaluate the feasibility of reusing an existing foundation and substructure of highway bridges. This framework incorporates three factors including safety, cost, and environmental impacts of reusing an existing foundation and compares the available alternatives to find the most feasible alternative. Four general options in bridge reconstruction projects are defined. The time-dependent probability of failure, time-dependent consequences of failure, and subsequently time-dependent safety risk associated with available options are estimated using a comprehensive reliability-based approach. In the next step, bridge life-cycle costs of each of the options are estimated using deterministic and probabilistic approaches. Later, the environmental impacts of each option are estimated using Life-cycle Environmental Impact Assessment (LCIEA). The combination of results of risk analysis, bridge life-cycle costs analysis, and environmental impacts assessment of all options are used to compare the reuse attractiveness of four options. The comparison is conducted by implementing a pairwise comparison technique to incorporate three criteria of safety, life-cycle costs, and environmental impacts of each option. The final decision on the reuse of an existing bridge foundation is made using the Analytical Hierarchy Process (AHP). Finally, Oxford Valley Road Bridge over US-1 in Bucks County, PA is used as a case study to demonstrate application of the proposed framework.
ISBN: 9798672190587Subjects--Topical Terms:
3173045
Industrial arts education.
Subjects--Index Terms:
Decision-making
Decision-Making in Reuse of Highway Bridge Foundations.
LDR
:04450nmm a2200505 4500
001
2282281
005
20211001100812.5
008
220723s2020 ||||||||||||||||| ||eng d
020
$a
9798672190587
035
$a
(MiAaPQ)AAI28091626
035
$a
AAI28091626
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Hoomaan, Ehssan.
$3
3561067
245
1 0
$a
Decision-Making in Reuse of Highway Bridge Foundations.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2020
300
$a
207 p.
500
$a
Source: Dissertations Abstracts International, Volume: 82-04, Section: B.
500
$a
Advisor: Agrawal, Anil K.
502
$a
Thesis (Ph.D.)--The City College of New York, 2020.
506
$a
This item must not be sold to any third party vendors.
520
$a
According to the 2019 National Bridge Inventory data from Federal Highway Administration, the average age of highway bridges in the U.S.A. is 45 years, with almost 43% of existing highway bridges being older than 50 years, and eight percent of all U.S. national highway bridges being in poor condition. Foundation and substructure of existing highway bridges (over land and water) may have significant functional values even after being under service for decades. Reusing an existing bridge foundation during the reconstruction of a bridge (e.g., major rehabilitation, retrofitting, replacement of superstructure and substructure, and addition/removal of a span) has the potential for significant savings on total cost and construction time. However, because of uncertainties in the evaluation of integrity, durability, and load-carrying capacity of an existing foundation, an inevitable level of risk is inherently associated with their reuse. This risk may weigh on potential benefits of reuse of a bridge foundation during the decision making. Therefore, developing a comprehensive framework and procedure for studying the feasibility of foundation reuse is an important step in the foundation reuse decision process. In particular, bridge owners need to have an estimation of various risks associated with available options during a reconstruction project (i.e., fully reuse, partial reuse, and no- reuse). In this dissertation, a decision-making framework is developed to evaluate the feasibility of reusing an existing foundation and substructure of highway bridges. This framework incorporates three factors including safety, cost, and environmental impacts of reusing an existing foundation and compares the available alternatives to find the most feasible alternative. Four general options in bridge reconstruction projects are defined. The time-dependent probability of failure, time-dependent consequences of failure, and subsequently time-dependent safety risk associated with available options are estimated using a comprehensive reliability-based approach. In the next step, bridge life-cycle costs of each of the options are estimated using deterministic and probabilistic approaches. Later, the environmental impacts of each option are estimated using Life-cycle Environmental Impact Assessment (LCIEA). The combination of results of risk analysis, bridge life-cycle costs analysis, and environmental impacts assessment of all options are used to compare the reuse attractiveness of four options. The comparison is conducted by implementing a pairwise comparison technique to incorporate three criteria of safety, life-cycle costs, and environmental impacts of each option. The final decision on the reuse of an existing bridge foundation is made using the Analytical Hierarchy Process (AHP). Finally, Oxford Valley Road Bridge over US-1 in Bucks County, PA is used as a case study to demonstrate application of the proposed framework.
590
$a
School code: 1606.
650
4
$a
Industrial arts education.
$3
3173045
650
4
$a
Materials science.
$3
543314
650
4
$a
Architectural engineering.
$3
3174102
650
4
$a
Public administration.
$3
531287
650
4
$a
Civil engineering.
$3
860360
650
4
$a
Land use planning.
$3
2122760
650
4
$a
Climate change.
$2
bicssc
$3
2079509
653
$a
Decision-making
653
$a
Environmental impacts
653
$a
Foundation reuse
653
$a
Risk analysis
653
$a
Substructure
653
$a
National Bridge Inventory
653
$a
Federal Highway Administration
653
$a
Bridge reconstruction
653
$a
Analytical Hierarchy Process
653
$a
Oxford Valley Road Bridge
653
$a
Pennsylvania
690
$a
0462
690
$a
0521
690
$a
0510
690
$a
0543
690
$a
0794
690
$a
0536
690
$a
0404
690
$a
0617
710
2
$a
The City College of New York.
$b
Civil Engineering.
$3
3183726
773
0
$t
Dissertations Abstracts International
$g
82-04B.
790
$a
1606
791
$a
Ph.D.
792
$a
2020
793
$a
English
856
4 0
$u
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=28091626
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9434014
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入