語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Value Delivery in Facilities Managem...
~
Terreno, Saratu N.
FindBook
Google Book
Amazon
博客來
Value Delivery in Facilities Management -A BIM-based Approach.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Value Delivery in Facilities Management -A BIM-based Approach./
作者:
Terreno, Saratu N.
出版者:
Ann Arbor : ProQuest Dissertations & Theses, : 2018,
面頁冊數:
217 p.
附註:
Source: Dissertations Abstracts International, Volume: 80-06, Section: B.
Contained By:
Dissertations Abstracts International80-06B.
標題:
Architectural engineering. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=13804060
ISBN:
9780438717626
Value Delivery in Facilities Management -A BIM-based Approach.
Terreno, Saratu N.
Value Delivery in Facilities Management -A BIM-based Approach.
- Ann Arbor : ProQuest Dissertations & Theses, 2018 - 217 p.
Source: Dissertations Abstracts International, Volume: 80-06, Section: B.
Thesis (Ph.D.)--The Pennsylvania State University, 2018.
This item must not be added to any third party search indexes.
The potential of Building Information Modeling (BIM) to add value to the practice of Facilities Management (FM) has long been discussed. The usefulness of the digital deliverables especially within asset management, and particularly in operations and maintenance has been described by numerous authors. Crucial to this is the potential integration of information, which would serve to increase efficiency and productivity on the job and in turn positively impact the primary organization's mission and goals. Other BIM concepts such as collaboration would also improve on present organizational culture by further inculcating the precept of teamwork and open information sharing. However, research has shown that FM organizations have been lagging in the uptake of BIM, especially in comparison to their project counterparts in design and construction. Challenges such as the lack of demonstrated and recorded examples of successful implementation, and a similar dearth of a structured method for implementation have been vocalized. Owners similarly demand a justification of returns or demonstrated value for their potential investment as reassurance for venturing into the game-changing prospect of BIM implementation. Indeed, the implementation of a new way of working with a different format of information would have a far-reaching effect on all aspects of managerial strategy, organizational culture and process and on existing technological structures. In answer to the demonstrated need this study aims to provide real-life examples of the implementation experiences of early adopters. To this effect three tertiary educational institutions have been chosen - owing to their large asset bases, owner-operator statuses and their progressive mindset with respect to the adoption of the new concept. Value stream mapping of organizational processes will identify areas of potential waste or non-value-adding activities, and also areas of potential value-adding opportunities. This would lead to the development of a value-focused process model which would streamline their processes and inculcate a strategic implementation. The probe will take into consideration the multiple facets of organizational culture and processes, managerial strategy and technological aspects; on both organizational and project levels. The lifecycle approach to a process-focused value-delivery of BIM would serve to foster a more holistic consideration, as potential added value and waste have been shown to increase in magnitude down through the lifecycle of a facility. The study will conclude with the development of a Value-Delivery Process Model with a mapped value stream, showing value-opportunity points for strategic analysis and implementation. A web-based IT tool will also be developed to aid the organizations in assessment of their value-delivery potential which will further serve to instill a higher level of value-focused thinking. It is expected that this study will increase knowledge in this area, and serve as a boost to inculcate value-focused strategic implementation of BIM in FM.
ISBN: 9780438717626Subjects--Topical Terms:
3174102
Architectural engineering.
Subjects--Index Terms:
Building information modeling
Value Delivery in Facilities Management -A BIM-based Approach.
LDR
:04426nmm a2200409 4500
001
2274376
005
20201202125006.5
008
220629s2018 ||||||||||||||||| ||eng d
020
$a
9780438717626
035
$a
(MiAaPQ)AAI13804060
035
$a
AAI13804060
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Terreno, Saratu N.
$3
3551864
245
1 0
$a
Value Delivery in Facilities Management -A BIM-based Approach.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2018
300
$a
217 p.
500
$a
Source: Dissertations Abstracts International, Volume: 80-06, Section: B.
500
$a
Publisher info.: Dissertation/Thesis.
500
$a
Advisor: Anumba, Chimay.
502
$a
Thesis (Ph.D.)--The Pennsylvania State University, 2018.
506
$a
This item must not be added to any third party search indexes.
506
$a
This item must not be sold to any third party vendors.
520
$a
The potential of Building Information Modeling (BIM) to add value to the practice of Facilities Management (FM) has long been discussed. The usefulness of the digital deliverables especially within asset management, and particularly in operations and maintenance has been described by numerous authors. Crucial to this is the potential integration of information, which would serve to increase efficiency and productivity on the job and in turn positively impact the primary organization's mission and goals. Other BIM concepts such as collaboration would also improve on present organizational culture by further inculcating the precept of teamwork and open information sharing. However, research has shown that FM organizations have been lagging in the uptake of BIM, especially in comparison to their project counterparts in design and construction. Challenges such as the lack of demonstrated and recorded examples of successful implementation, and a similar dearth of a structured method for implementation have been vocalized. Owners similarly demand a justification of returns or demonstrated value for their potential investment as reassurance for venturing into the game-changing prospect of BIM implementation. Indeed, the implementation of a new way of working with a different format of information would have a far-reaching effect on all aspects of managerial strategy, organizational culture and process and on existing technological structures. In answer to the demonstrated need this study aims to provide real-life examples of the implementation experiences of early adopters. To this effect three tertiary educational institutions have been chosen - owing to their large asset bases, owner-operator statuses and their progressive mindset with respect to the adoption of the new concept. Value stream mapping of organizational processes will identify areas of potential waste or non-value-adding activities, and also areas of potential value-adding opportunities. This would lead to the development of a value-focused process model which would streamline their processes and inculcate a strategic implementation. The probe will take into consideration the multiple facets of organizational culture and processes, managerial strategy and technological aspects; on both organizational and project levels. The lifecycle approach to a process-focused value-delivery of BIM would serve to foster a more holistic consideration, as potential added value and waste have been shown to increase in magnitude down through the lifecycle of a facility. The study will conclude with the development of a Value-Delivery Process Model with a mapped value stream, showing value-opportunity points for strategic analysis and implementation. A web-based IT tool will also be developed to aid the organizations in assessment of their value-delivery potential which will further serve to instill a higher level of value-focused thinking. It is expected that this study will increase knowledge in this area, and serve as a boost to inculcate value-focused strategic implementation of BIM in FM.
590
$a
School code: 0176.
650
4
$a
Architectural engineering.
$3
3174102
650
4
$a
Information technology.
$3
532993
653
$a
Building information modeling
653
$a
Facilities management
653
$a
IT implementation
653
$a
Information management
653
$a
Lean BIM
653
$a
Value
690
$a
0454
690
$a
0462
690
$a
0489
710
2
$a
The Pennsylvania State University.
$b
Architectural Engineering.
$3
2099219
773
0
$t
Dissertations Abstracts International
$g
80-06B.
790
$a
0176
791
$a
Ph.D.
792
$a
2018
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=13804060
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9426610
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入