Causes of delay in construction proj...
~
Abu Hassan, Mohanad H. A.
FindBook
Google Book
Amazon
博客來
Causes of delay in construction projects.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Causes of delay in construction projects./
作者:
Abu Hassan, Mohanad H. A.
出版者:
Ann Arbor : ProQuest Dissertations & Theses, : 2016,
面頁冊數:
124 p.
附註:
Source: Masters Abstracts International, Volume: 55-04.
Contained By:
Masters Abstracts International55-04(E).
標題:
Architectural engineering. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10100923
ISBN:
9781339647920
Causes of delay in construction projects.
Abu Hassan, Mohanad H. A.
Causes of delay in construction projects.
- Ann Arbor : ProQuest Dissertations & Theses, 2016 - 124 p.
Source: Masters Abstracts International, Volume: 55-04.
Thesis (M.S.)--Qatar University (Qatar), 2016.
This item is not available from ProQuest Dissertations & Theses.
The construction industry is struggling by numerous recorded incidents of delay due to improper planning and/or implementation of required construction measures. Globally, researchers have concluded that the construction environment is overloaded with more frequent delays when compared to other labor enforced industries. Over the past decade, infrastructure and project development in developing countries have experienced major growth. Since there are huge investments on construction activities that all of a sudden happen in a very narrow considerable construction period, it is expected that construction fields suffer from severe delays during construction. Construction stakeholders need to enforce huge efforts to facilitate the smooth flow of construction projects. The aim and objective of this project is to identify the most significant delay attributes affecting the construction industry. After a review of the literature, a list of 42 delay attributes were gathered and presented in a survey questionnaire. The survey was distributed through online website and sent to various experts in the construction industry. 179 complete responses were received and analyzed by importance index, Spearman's rank correlation, T-Test, risk mapping and factor analysis. As a result, it was found "low productivity of labor", "delay in decision making", "changes to the project by owner", "delays related to subcontractors work", and "unqualified workforce" were ranked as the most significant delay attributes in construction industry respectively.
ISBN: 9781339647920Subjects--Topical Terms:
3174102
Architectural engineering.
Causes of delay in construction projects.
LDR
:02535nmm a2200325 4500
001
2155979
005
20180517123953.5
008
190424s2016 ||||||||||||||||| ||eng d
020
$a
9781339647920
035
$a
(MiAaPQ)AAI10100923
035
$a
(MiAaPQ)qatar:10014
035
$a
AAI10100923
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Abu Hassan, Mohanad H. A.
$3
3343739
245
1 0
$a
Causes of delay in construction projects.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2016
300
$a
124 p.
500
$a
Source: Masters Abstracts International, Volume: 55-04.
500
$a
Adviser: Murat Gunduz.
502
$a
Thesis (M.S.)--Qatar University (Qatar), 2016.
506
$a
This item is not available from ProQuest Dissertations & Theses.
520
$a
The construction industry is struggling by numerous recorded incidents of delay due to improper planning and/or implementation of required construction measures. Globally, researchers have concluded that the construction environment is overloaded with more frequent delays when compared to other labor enforced industries. Over the past decade, infrastructure and project development in developing countries have experienced major growth. Since there are huge investments on construction activities that all of a sudden happen in a very narrow considerable construction period, it is expected that construction fields suffer from severe delays during construction. Construction stakeholders need to enforce huge efforts to facilitate the smooth flow of construction projects. The aim and objective of this project is to identify the most significant delay attributes affecting the construction industry. After a review of the literature, a list of 42 delay attributes were gathered and presented in a survey questionnaire. The survey was distributed through online website and sent to various experts in the construction industry. 179 complete responses were received and analyzed by importance index, Spearman's rank correlation, T-Test, risk mapping and factor analysis. As a result, it was found "low productivity of labor", "delay in decision making", "changes to the project by owner", "delays related to subcontractors work", and "unqualified workforce" were ranked as the most significant delay attributes in construction industry respectively.
590
$a
School code: 1890.
650
4
$a
Architectural engineering.
$3
3174102
650
4
$a
Management.
$3
516664
650
4
$a
Labor economics.
$3
642730
690
$a
0462
690
$a
0454
690
$a
0510
710
2
$a
Qatar University (Qatar).
$b
Engineering Management.
$3
3343740
773
0
$t
Masters Abstracts International
$g
55-04(E).
790
$a
1890
791
$a
M.S.
792
$a
2016
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10100923
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9355526
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入