高屏溪攔河堰完工後沉砂池功能檢討水工模型試驗報告 = = Hydrau...
經濟部水利處

Linked to FindBook      Google Book      Amazon      博客來     
  • 高屏溪攔河堰完工後沉砂池功能檢討水工模型試驗報告 = = Hydraulic model test review on the functions ofdeposition basin of the exist Kao-Ping Weir /
  • Record Type: Language materials, printed : Monograph/item
    Title/Author: 高屏溪攔河堰完工後沉砂池功能檢討水工模型試驗報告 = / 經濟部水利處水利規劃試驗所著
    Reminder of title: Hydraulic model test review on the functions ofdeposition basin of the exist Kao-Ping Weir /
    remainder title: Hydraulic model test review on the functions ofdeposition basin of the exist Kao-Ping Weir
    Corporate Body: 經濟部
    Published: 臺中縣霧峰鄉 : 經濟部水利處水利規劃試驗所, : 民90[2001],
    Description: 1冊 : 部份彩圖, 地圖 ; 30公分
    Subject: 攔河堰 -
Location:  Year:  Volume Number: 
Items
  • 1 records • Pages 1 •
 
GE0027370 罕用書庫123室(美崙校區,調書請點預約)(RU_123) 01.外借(書)_YB 一般圖書 443.68 2301-1 一般使用(Normal) On shelf 0
  • 1 records • Pages 1 •
Reviews
Export
pickup library
 
 
Change password
Login