Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Intelligent 3D interactive open pit ...
~
Askari-Nasab, Hooman.
Linked to FindBook
Google Book
Amazon
博客來
Intelligent 3D interactive open pit mine planning and optimization.
Record Type:
Language materials, printed : Monograph/item
Title/Author:
Intelligent 3D interactive open pit mine planning and optimization./
Author:
Askari-Nasab, Hooman.
Description:
167 p.
Notes:
Source: Dissertation Abstracts International, Volume: 68-01, Section: B, page: 0598.
Contained By:
Dissertation Abstracts International68-01B.
Subject:
Engineering, Civil. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=NR22986
ISBN:
9780494229866
Intelligent 3D interactive open pit mine planning and optimization.
Askari-Nasab, Hooman.
Intelligent 3D interactive open pit mine planning and optimization.
- 167 p.
Source: Dissertation Abstracts International, Volume: 68-01, Section: B, page: 0598.
Thesis (Ph.D.)--University of Alberta (Canada), 2006.
Numerous attempts have been made to address the computationally intractable open pit optimization and long-term planning problem. Heuristic methods, economic parametric analysis, operations research, and genetic algorithms have been used to formulate periodic open pit long-term schedules. In practice all these techniques have limitations in dealing with large industrial problems; stochastic processes governing mining technical and economic variables; temporal nature of exploitation; and mine to mill integration. In complex mining operations, small deviations from the optimal strategic plan could result in the loss of millions of dollars.
ISBN: 9780494229866Subjects--Topical Terms:
783781
Engineering, Civil.
Intelligent 3D interactive open pit mine planning and optimization.
LDR
:03234nam 2200277 a 45
001
970839
005
20110921
008
110921s2006 eng d
020
$a
9780494229866
035
$a
(UMI)AAINR22986
035
$a
AAINR22986
040
$a
UMI
$c
UMI
100
1
$a
Askari-Nasab, Hooman.
$3
1294879
245
1 0
$a
Intelligent 3D interactive open pit mine planning and optimization.
300
$a
167 p.
500
$a
Source: Dissertation Abstracts International, Volume: 68-01, Section: B, page: 0598.
502
$a
Thesis (Ph.D.)--University of Alberta (Canada), 2006.
520
$a
Numerous attempts have been made to address the computationally intractable open pit optimization and long-term planning problem. Heuristic methods, economic parametric analysis, operations research, and genetic algorithms have been used to formulate periodic open pit long-term schedules. In practice all these techniques have limitations in dealing with large industrial problems; stochastic processes governing mining technical and economic variables; temporal nature of exploitation; and mine to mill integration. In complex mining operations, small deviations from the optimal strategic plan could result in the loss of millions of dollars.
520
$a
The primary research goal is to develop, analyze, and implement a 3-D intelligent open pit optimal production simulator (IOPS) based on reinforcement learning (RL) to maximize the net present value (NPV) of the venture. Also a continuous open pit simulator (COPS) based on the modified open pit geometrical model and a system of differential equations have been developed to capture the continuous-time open pit dynamics for tactical purposes. The Java Reinforcement Learning Library was chosen as the core of the IOPS application implementation. Java programming language and MATLAB were selected as the platform for programming and graphical user interface (GUI) implementation.
520
$a
To verify and validate the research models, a case study on an iron ore deposit with 114,000 blocks was carried out. The final pit limits were determined using Lerch's Grossman's algorithm with the Whittle software. The optimized final pit limits show the total amount of 399 million tonnes of material consisting of 220 million tonnes of ore and 179 million tonnes of waste. The practical annual schedule generated by the industry standard tool---Milawa algorithm used in Whittle software---yielded an NPV of
$4
30 million over a 21-year mine life at a discount rate of 10% per annum. The practical learned scenario of 3000 simulation iterations using IOPS yielded an NPV of
$4
38 million over the same time span. Experiments were also performed to compare the annual stripping ratio, average grade, annual waste, and the ore and concentrate production. The outcome of the research demonstrated a strong promise towards improving the expected net present value of mining investments. The algorithms developed can be the basis of the next generation of mine design software packages.
590
$a
School code: 0351.
650
4
$a
Engineering, Civil.
$3
783781
650
4
$a
Engineering, Mining.
$3
1035560
690
$a
0543
690
$a
0551
710
2 0
$a
University of Alberta (Canada).
$3
626651
773
0
$t
Dissertation Abstracts International
$g
68-01B.
790
$a
0351
791
$a
Ph.D.
792
$a
2006
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=NR22986
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9129316
電子資源
11.線上閱覽_V
電子書
EB W9129316
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login