語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Optimizing the project team's contri...
~
Rowland, Don Chad.
FindBook
Google Book
Amazon
博客來
Optimizing the project team's contribution to business objectives .
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Optimizing the project team's contribution to business objectives ./
作者:
Rowland, Don Chad.
面頁冊數:
240 p.
附註:
Adviser: William Edward Back.
Contained By:
Masters Abstracts International45-02.
標題:
Engineering, Civil. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=1439224
ISBN:
9780542963155
Optimizing the project team's contribution to business objectives .
Rowland, Don Chad.
Optimizing the project team's contribution to business objectives .
- 240 p.
Adviser: William Edward Back.
Thesis (M.S.)--Clemson University, 2006.
The traditional expectations of the project team are for the processes of engineering, procurement, construction, and start-up to be expertly administered. However, these performance criteria can be satisfied yet still not meet the ultimate business needs of the owner. The purpose of this thesis was to determine ways to improve the likelihood of achieving owner's business objectives. Fifty-one questionnaire survey forms were analyzed to obtain data for thirty-three pre-project planning activities. A data analysis concluded with a degree of statistical significance that for thirteen of the thirty-three activities, the more successful projects, as defined by the satisfaction of the business objectives, expended more time and/or more resources when performing the activities. Further, statistically significant differences were uncovered with respect to the extent an activity was successfully executed, the extent of activity complexity, the respondent's perception of activity efficiency, and the extent to which the information was available.
ISBN: 9780542963155Subjects--Topical Terms:
783781
Engineering, Civil.
Optimizing the project team's contribution to business objectives .
LDR
:01902nam 2200277 a 45
001
967620
005
20110915
008
110915s2006 eng d
020
$a
9780542963155
035
$a
(UMI)AAI1439224
035
$a
AAI1439224
040
$a
UMI
$c
UMI
100
1
$a
Rowland, Don Chad.
$3
1291488
245
1 0
$a
Optimizing the project team's contribution to business objectives .
300
$a
240 p.
500
$a
Adviser: William Edward Back.
500
$a
Source: Masters Abstracts International, Volume: 45-02, page: 0975.
502
$a
Thesis (M.S.)--Clemson University, 2006.
520
$a
The traditional expectations of the project team are for the processes of engineering, procurement, construction, and start-up to be expertly administered. However, these performance criteria can be satisfied yet still not meet the ultimate business needs of the owner. The purpose of this thesis was to determine ways to improve the likelihood of achieving owner's business objectives. Fifty-one questionnaire survey forms were analyzed to obtain data for thirty-three pre-project planning activities. A data analysis concluded with a degree of statistical significance that for thirteen of the thirty-three activities, the more successful projects, as defined by the satisfaction of the business objectives, expended more time and/or more resources when performing the activities. Further, statistically significant differences were uncovered with respect to the extent an activity was successfully executed, the extent of activity complexity, the respondent's perception of activity efficiency, and the extent to which the information was available.
590
$a
School code: 0050.
650
4
$a
Engineering, Civil.
$3
783781
650
4
$a
Engineering, General.
$3
1020744
690
$a
0537
690
$a
0543
710
2 0
$a
Clemson University.
$3
997173
773
0
$t
Masters Abstracts International
$g
45-02.
790
$a
0050
790
1 0
$a
Back, William Edward,
$e
advisor
791
$a
M.S.
792
$a
2006
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=1439224
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9126274
電子資源
11.線上閱覽_V
電子書
EB W9126274
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入