Computerized construction delay mana...
~
Aoude, Hisham Sleiman.
FindBook
Google Book
Amazon
博客來
Computerized construction delay management system.
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
Computerized construction delay management system./
作者:
Aoude, Hisham Sleiman.
面頁冊數:
274 p.
附註:
Chairperson: Janet K. Yates.
Contained By:
Dissertation Abstracts International56-09B.
標題:
Engineering, Civil. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=9544808
Computerized construction delay management system.
Aoude, Hisham Sleiman.
Computerized construction delay management system.
- 274 p.
Chairperson: Janet K. Yates.
Thesis (Ph.D.)--Polytechnic University, 1996.
Managing delays on construction projects includes analyzing available information and the formulation of summaries that aid in decision making processes. In order to make more informed decisions, personnel and managers at construction sites need to provide useful information on construction delays. To meet this need a study was conducted to identify and quantify delays encountered on both domestic and international construction projects. The research also included the development of a computer program called the Construction Delay Analysis System (CDAS).Subjects--Topical Terms:
783781
Engineering, Civil.
Computerized construction delay management system.
LDR
:03141nam 2200313 a 45
001
927508
005
20110425
008
110425s1996 eng d
035
$a
(UnM)AAI9544808
035
$a
AAI9544808
040
$a
UnM
$c
UnM
100
1
$a
Aoude, Hisham Sleiman.
$3
1251068
245
1 0
$a
Computerized construction delay management system.
300
$a
274 p.
500
$a
Chairperson: Janet K. Yates.
500
$a
Source: Dissertation Abstracts International, Volume: 56-09, Section: B, page: 5032.
502
$a
Thesis (Ph.D.)--Polytechnic University, 1996.
520
$a
Managing delays on construction projects includes analyzing available information and the formulation of summaries that aid in decision making processes. In order to make more informed decisions, personnel and managers at construction sites need to provide useful information on construction delays. To meet this need a study was conducted to identify and quantify delays encountered on both domestic and international construction projects. The research also included the development of a computer program called the Construction Delay Analysis System (CDAS).
520
$a
The captured knowledge allowed for the documentation, for the very first time, of measures construction personnel take to rectify the fifty most frequently occurring type of delays on construction projects, and facilitated the classification of these delays along the lines of project, contract, and location related parameters.
520
$a
The CDAS system assists in identifying and quantifying delays encountered on construction projects. It constitutes an interactive system for reviewing and recording the production of individual activities and for monitoring and reporting the overall status of a construction project. CDAS provides a consistent, detailed, and systematic analysis of progress, causes of delays, and corrective actions at any time during the life cycle of a project. The system imports project schedules from Project Management Software such as Open Plan and Primavera, documents schedule delays, and tracks historical information for the purpose of delay claims.
520
$a
The CDAS computer program was developed under a grant from the National Science Foundation Industry participation in the research was provided by members of construction firms, owner organizations, engineering firms, and division offices of the U.S. Army Corps of Engineers and it was essential in formulating the knowledge of the system.
520
$a
The major advantages of the CDAS program are the consistency it introduces into decision making processes, and the amount of time it reduces in gathering data for the dispute resolution process upon completion of a construction project. It is envisioned that the dynamic attributes of the system will enhance information processing and decision making in construction projects.
590
$a
School code: 0179.
650
4
$a
Engineering, Civil.
$3
783781
650
4
$a
Engineering, System Science.
$3
1018128
690
$a
0543
690
$a
0790
710
2 0
$a
Polytechnic University.
$3
1249856
773
0
$t
Dissertation Abstracts International
$g
56-09B.
790
$a
0179
790
1 0
$a
Yates, Janet K.,
$e
advisor
791
$a
Ph.D.
792
$a
1996
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=9544808
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9099356
電子資源
11.線上閱覽_V
電子書
EB W9099356
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入