語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Integrated inventory and production ...
~
Boston University.
FindBook
Google Book
Amazon
博客來
Integrated inventory and production planning in a semiconductor supply chain.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Integrated inventory and production planning in a semiconductor supply chain./
作者:
Tian, Feng.
面頁冊數:
116 p.
附註:
Adviser: Sean P. Willems.
Contained By:
Dissertation Abstracts International69-05A.
標題:
Business Administration, Management. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3314082
ISBN:
9780549635086
Integrated inventory and production planning in a semiconductor supply chain.
Tian, Feng.
Integrated inventory and production planning in a semiconductor supply chain.
- 116 p.
Adviser: Sean P. Willems.
Thesis (D.B.A.)--Boston University, 2008.
While the problem context is one major semiconductor manufacturer, and semiconductor manufacturing does have domain-specific nuances, our resulting formulation is general enough to apply to any discrete-parts manufacturing operation.
ISBN: 9780549635086Subjects--Topical Terms:
626628
Business Administration, Management.
Integrated inventory and production planning in a semiconductor supply chain.
LDR
:03377nmm 2200301 a 45
001
890951
005
20101105
008
101105s2008 ||||||||||||||||| ||eng d
020
$a
9780549635086
035
$a
(UMI)AAI3314082
035
$a
AAI3314082
040
$a
UMI
$c
UMI
100
1
$a
Tian, Feng.
$3
1036227
245
1 0
$a
Integrated inventory and production planning in a semiconductor supply chain.
300
$a
116 p.
500
$a
Adviser: Sean P. Willems.
500
$a
Source: Dissertation Abstracts International, Volume: 69-05, Section: A, page: 1881.
502
$a
Thesis (D.B.A.)--Boston University, 2008.
520
$a
While the problem context is one major semiconductor manufacturer, and semiconductor manufacturing does have domain-specific nuances, our resulting formulation is general enough to apply to any discrete-parts manufacturing operation.
520
$a
Advanced planning and scheduling (APS) has been implemented in major corporations for over twenty years. In comparison, multi-echelon inventory optimization systems (IOS) are still at an earlier point in their adoption cycle. The adoption of inventory optimization will create the opportunity to jointly solve the production and inventory problem, enabling planners to bring model-based results to a revised sales, inventory, and operations process.
520
$a
Traditionally, APS and IOS are considered belong to difference planning layers and are solved independently. APS systems are every day use operational planning tool, and generally assume deterministic demand and assign a linear penalty cost for both demand and inventory shortfalls. While resource capacity is always taken into consideration in APS systems, managing uncertainty is beyond its capability. On the other hand, IOS is taken as part of the tactical planning and has long been developed to treat the demand uncertainty. But current development always sacrifices some system complexity, such as capacity constraint. Hierarchical decision making and monolithic model are the two approaches exist to solve the production-inventory problems. However, the hierarchical approach does not guarantee the solution of top-level aggregate model can generate a feasible disaggregation for the item-level problem. Most of current monolithic models still lack the capability to handle the safety stock issue in a general planning system.
520
$a
This research formulates the integrated production-inventory problem faced in a semiconductor supply chain. The emphasis of our work is on finding practical solutions to support planners making production and inventory decisions as part of their operation planning process. Our work will start with iteratively solving two known optimization problems: a production planning optimization and a multi-echelon inventory optimization. While this iterative approach can admittedly produce a suboptimal solution, it represents a good start to understand the correlation of the inventory optimization problem and the production planning problem. Then we will work on an integrated model that optimizes inventory and production planning problems simultaneously.
590
$a
School code: 0017.
650
4
$a
Business Administration, Management.
$3
626628
690
$a
0454
710
2
$a
Boston University.
$3
1017454
773
0
$t
Dissertation Abstracts International
$g
69-05A.
790
$a
0017
790
1 0
$a
Willems, Sean P.,
$e
advisor
791
$a
D.B.A.
792
$a
2008
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3314082
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9083079
電子資源
11.線上閱覽_V
電子書
EB W9083079
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入