Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
The time value of risk -- A case stu...
~
The University of Arizona., Mining Geological & Geophysical Engineering.
Linked to FindBook
Google Book
Amazon
博客來
The time value of risk -- A case study at the boron operations open pit mine.
Record Type:
Electronic resources : Monograph/item
Title/Author:
The time value of risk -- A case study at the boron operations open pit mine./
Author:
Yost, Raymond R.
Description:
248 p.
Notes:
Adviser: John Kemeny.
Contained By:
Dissertation Abstracts International70-04B.
Subject:
Engineering, Mining. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3352588
ISBN:
9781109104080
The time value of risk -- A case study at the boron operations open pit mine.
Yost, Raymond R.
The time value of risk -- A case study at the boron operations open pit mine.
- 248 p.
Adviser: John Kemeny.
Thesis (Ph.D.)--The University of Arizona, 2009.
The evaluation of risk is often performed assuming static conditions when in reality, conditions are continually evolving. In the following dissertation, the evaluation of risk with changing conditions over time is considered for a specific project - placing overburden into an active, open pit mine. The research focuses on the geotechnical components of risk with the goal of identifying whether and to what extent it is possible to place overburden on mined out portions of the open pit slopes. The relevant factors, which change with time or impact risk, are first identified and an evaluation is performed to estimate a probability of failure at various stages of the project life. Potential damages are then assessed by first evaluating the run out distance and post failure geometry of a slope failure and then estimating the percentage of material that would have to be removed to continue extraction of ore. To convert the uncertainty into economic terms, unit values for savings that result from placing overburden in the pit and costs associated with cleaning up failure debris are estimated. The probability of failure, potential for cleanup, and unit values are combined to produce estimates of the likely costs and benefits associated with dumping overburden in the open pit.
ISBN: 9781109104080Subjects--Topical Terms:
1035560
Engineering, Mining.
The time value of risk -- A case study at the boron operations open pit mine.
LDR
:02583nmm 2200313 a 45
001
890737
005
20101104
008
101104s2009 ||||||||||||||||| ||eng d
020
$a
9781109104080
035
$a
(UMI)AAI3352588
035
$a
AAI3352588
040
$a
UMI
$c
UMI
100
1
$a
Yost, Raymond R.
$3
1064703
245
1 4
$a
The time value of risk -- A case study at the boron operations open pit mine.
300
$a
248 p.
500
$a
Adviser: John Kemeny.
500
$a
Source: Dissertation Abstracts International, Volume: 70-04, Section: B, page: 2548.
502
$a
Thesis (Ph.D.)--The University of Arizona, 2009.
520
$a
The evaluation of risk is often performed assuming static conditions when in reality, conditions are continually evolving. In the following dissertation, the evaluation of risk with changing conditions over time is considered for a specific project - placing overburden into an active, open pit mine. The research focuses on the geotechnical components of risk with the goal of identifying whether and to what extent it is possible to place overburden on mined out portions of the open pit slopes. The relevant factors, which change with time or impact risk, are first identified and an evaluation is performed to estimate a probability of failure at various stages of the project life. Potential damages are then assessed by first evaluating the run out distance and post failure geometry of a slope failure and then estimating the percentage of material that would have to be removed to continue extraction of ore. To convert the uncertainty into economic terms, unit values for savings that result from placing overburden in the pit and costs associated with cleaning up failure debris are estimated. The probability of failure, potential for cleanup, and unit values are combined to produce estimates of the likely costs and benefits associated with dumping overburden in the open pit.
520
$a
The results of the analysis indicated that risk varies considerably with time. However, it is possible to place overburden in the central portion of the open pit up to a limit of approximately 80 million tons while maintaining a positive net value of expected costs and benefits.
590
$a
School code: 0009.
650
4
$a
Engineering, Mining.
$3
1035560
690
$a
0551
710
2
$a
The University of Arizona.
$b
Mining Geological & Geophysical Engineering.
$3
1035676
773
0
$t
Dissertation Abstracts International
$g
70-04B.
790
$a
0009
790
1 0
$a
Kemeny, John,
$e
advisor
790
1 0
$a
Meko, David
$e
committee member
790
1 0
$a
Momayez, Moe
$e
committee member
790
1 0
$a
Zavodni, Zavis
$e
committee member
791
$a
Ph.D.
792
$a
2009
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3352588
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9082865
電子資源
11.線上閱覽_V
電子書
EB W9082865
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login