Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Linked to FindBook
Google Book
Amazon
博客來
Progress in improving project management at the Department of Energy, 2002 interim assessment
Record Type:
Electronic resources : Monograph/item
Title/Author:
Progress in improving project management at the Department of Energy, 2002 interim assessment/
Author:
Reinschmidt, Kenneth F.
other author:
Abraham, Spencer.
Published:
[Washington, D.C.] :Board on Infrastructure and Constructed Environment, Division on Engineering and Physical Sciences, : [2002],
Notes:
Letter dated May 23, 2002.
Subject:
Project management - United States. -
Online resource:
https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=123492An electronic book accessible through the World Wide Web; click for information
ISBN:
0309581591 (electronic bk.)
Progress in improving project management at the Department of Energy, 2002 interim assessment
Reinschmidt, Kenneth F.
Progress in improving project management at the Department of Energy, 2002 interim assessment
[electronic resource]. - [Washington, D.C.] :Board on Infrastructure and Constructed Environment, Division on Engineering and Physical Sciences,[2002]
Letter dated May 23, 2002.
Made available through NetLibrary; access may be limited to NetLibrary affiliated libraries.
Mode of access: World Wide Web.
ISBN: 0309581591 (electronic bk.)Subjects--Corporate Names:
545937
United States.
Dept. of Energy.Subjects--Topical Terms:
775805
Project management
--United States.Index Terms--Genre/Form:
542853
Electronic books.
LC Class. No.: TJ163.25.U6 / R45 2002eb
Dewey Class. No.: 354.423650973
Progress in improving project management at the Department of Energy, 2002 interim assessment
LDR
:01146nmm a2200265 a 45
001
737659
003
OCoLC
005
20080418
006
m d
007
cr cnu---unuuu
008
250519s2002 dcu s 000 0 eng d
020
$a
0309581591 (electronic bk.)
035
$a
ocm58676709
035
$a
737659
040
$a
N
$c
N
049
$a
AMFA
050
1 4
$a
TJ163.25.U6
$b
R45 2002eb
082
0 4
$a
354.423650973
$2
22
100
$a
Reinschmidt, Kenneth F.
$3
837140
245
1 0
$a
Progress in improving project management at the Department of Energy, 2002 interim assessment
$h
[electronic resource].
260
$a
[Washington, D.C.] :
$c
[2002]
$b
Board on Infrastructure and Constructed Environment, Division on Engineering and Physical Sciences,
500
$a
Letter dated May 23, 2002.
500
$a
Title from subject line of letter of transmittal from Kenneth F. Reinschmidt to Spencer Abraham on title screen (viewed on Mar. 29, 2005).
506
$a
Made available through NetLibrary; access may be limited to NetLibrary affiliated libraries.
538
$a
Mode of access: World Wide Web.
610
$a
United States.
$b
Dept. of Energy.
$3
545937
650
$a
Project management
$z
United States.
$3
775805
655
$a
Electronic books.
$2
lcsh
$3
542853
700
$a
Abraham, Spencer.
$3
837641
710
$a
National Research Council (U.S.).
$b
Board on Infrastructure and the Constructed Environment.
$3
587814
710
$a
NetLibrary, Inc.
$3
542851
856
4 0
$3
Bibliographic record display
$u
https://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&AN=123492
$z
An electronic book accessible through the World Wide Web; click for information
994
$a
92
$b
AMF
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9035978
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login