Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Contingency Analysis for Coupled Pow...
~
Gorman, Brandon T.
Linked to FindBook
Google Book
Amazon
博客來
Contingency Analysis for Coupled Power-water Networks.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Contingency Analysis for Coupled Power-water Networks./
Author:
Gorman, Brandon T.
Published:
Ann Arbor : ProQuest Dissertations & Theses, : 2020,
Description:
107 p.
Notes:
Source: Dissertations Abstracts International, Volume: 81-11.
Contained By:
Dissertations Abstracts International81-11.
Subject:
Civil engineering. -
Online resource:
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=27961427
ISBN:
9798645461911
Contingency Analysis for Coupled Power-water Networks.
Gorman, Brandon T.
Contingency Analysis for Coupled Power-water Networks.
- Ann Arbor : ProQuest Dissertations & Theses, 2020 - 107 p.
Source: Dissertations Abstracts International, Volume: 81-11.
Thesis (Ph.D.)--Arizona State University, 2020.
This item must not be sold to any third party vendors.
A mathematical approach was developed to evaluate the resilience of coupled power-water networks using a variant of contingency analysis adapted from electric transmission studies. In particular, the "what if" scenarios explored in power systems research were extended and applied for coupled power-water network research by evaluating how stressors and failures in the water network can propagate across system boundaries and into the electric network. Reduction in power system contingency reserves was the metric for determining violation of N-1 contingency reliability. Geospatial considerations were included using high-resolution, publicly available Geographic Information System data on infrastructure in the Phoenix Metropolitan Area that was used to generate a power network with 599 transmission lines and total generation capacity of 18.98 GW and a water network with 2,624 water network lines and capacity to serve up to 1.72M GPM of surface water. The steady-state model incorporated operating requirements for the power network-e.g., contingency reserves-and the water network-e.g., pressure ranges-while seeking to meet electric load and water demand. Interconnections developed between the infrastructures demonstrated how alternations to the system state and/or configuration of one network affect the other network, with results demonstrated through co-simulation of the power network and water network using OpenDSS and EPANET, respectively. Results indicate four key findings that help operators understand the interdependent behavior of the coupled power-water network: (i) two water failure scenarios (water flowing out of Waddell dam and CAP canal flowing west of Waddell dam) are critical to power-water network N-1 contingency reliability above 60% power system loading and at 100% water system demand, (ii) fast-starting natural gas generating units are necessary to maintain N-1 contingency reliability below 60% power system loading, (iii) Coolidge Station was the power plant to most frequently undergo a reduction in reserves amongst the water failure scenarios that cause a violation of N-1 reliability, (iv) power network vulnerability to water network failures was non-linear because it depends on the generating units that are dispatched, which can vary as line thermal limits or unit generation capacities are reached.
ISBN: 9798645461911Subjects--Topical Terms:
860360
Civil engineering.
Subjects--Index Terms:
Infrastructure
Contingency Analysis for Coupled Power-water Networks.
LDR
:03478nmm a2200385 4500
001
2275776
005
20210401103735.5
008
220723s2020 ||||||||||||||||| ||eng d
020
$a
9798645461911
035
$a
(MiAaPQ)AAI27961427
035
$a
AAI27961427
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Gorman, Brandon T.
$3
3344160
245
1 0
$a
Contingency Analysis for Coupled Power-water Networks.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2020
300
$a
107 p.
500
$a
Source: Dissertations Abstracts International, Volume: 81-11.
500
$a
Advisor: Johnson, Nathan G.
502
$a
Thesis (Ph.D.)--Arizona State University, 2020.
506
$a
This item must not be sold to any third party vendors.
520
$a
A mathematical approach was developed to evaluate the resilience of coupled power-water networks using a variant of contingency analysis adapted from electric transmission studies. In particular, the "what if" scenarios explored in power systems research were extended and applied for coupled power-water network research by evaluating how stressors and failures in the water network can propagate across system boundaries and into the electric network. Reduction in power system contingency reserves was the metric for determining violation of N-1 contingency reliability. Geospatial considerations were included using high-resolution, publicly available Geographic Information System data on infrastructure in the Phoenix Metropolitan Area that was used to generate a power network with 599 transmission lines and total generation capacity of 18.98 GW and a water network with 2,624 water network lines and capacity to serve up to 1.72M GPM of surface water. The steady-state model incorporated operating requirements for the power network-e.g., contingency reserves-and the water network-e.g., pressure ranges-while seeking to meet electric load and water demand. Interconnections developed between the infrastructures demonstrated how alternations to the system state and/or configuration of one network affect the other network, with results demonstrated through co-simulation of the power network and water network using OpenDSS and EPANET, respectively. Results indicate four key findings that help operators understand the interdependent behavior of the coupled power-water network: (i) two water failure scenarios (water flowing out of Waddell dam and CAP canal flowing west of Waddell dam) are critical to power-water network N-1 contingency reliability above 60% power system loading and at 100% water system demand, (ii) fast-starting natural gas generating units are necessary to maintain N-1 contingency reliability below 60% power system loading, (iii) Coolidge Station was the power plant to most frequently undergo a reduction in reserves amongst the water failure scenarios that cause a violation of N-1 reliability, (iv) power network vulnerability to water network failures was non-linear because it depends on the generating units that are dispatched, which can vary as line thermal limits or unit generation capacities are reached.
590
$a
School code: 0010.
650
4
$a
Civil engineering.
$3
860360
650
4
$a
Electrical engineering.
$3
649834
650
4
$a
Hydraulic engineering.
$3
613609
653
$a
Infrastructure
653
$a
Interdependent
653
$a
Phoenix
653
$a
Power
653
$a
Simulation
653
$a
Water
690
$a
0543
690
$a
0544
690
$a
0218
710
2
$a
Arizona State University.
$b
Civil, Environmental and Sustainable Engineering.
$3
3289089
773
0
$t
Dissertations Abstracts International
$g
81-11.
790
$a
0010
791
$a
Ph.D.
792
$a
2020
793
$a
English
856
4 0
$u
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=27961427
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9427510
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login