語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Capacitated lot sizing problems in p...
~
Ramya, Ravi.
FindBook
Google Book
Amazon
博客來
Capacitated lot sizing problems in process industries
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Capacitated lot sizing problems in process industries/ by Ravi Ramya ... [et al.].
其他作者:
Ramya, Ravi.
出版者:
Cham :Springer International Publishing : : 2019.,
面頁冊數:
xxxv, 19 p. :ill., digital ;24 cm.
內容註:
Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments.
Contained By:
Springer eBooks
標題:
Production control. -
電子資源:
https://doi.org/10.1007/978-3-030-01222-9
ISBN:
9783030012229
Capacitated lot sizing problems in process industries
Capacitated lot sizing problems in process industries
[electronic resource] /by Ravi Ramya ... [et al.]. - Cham :Springer International Publishing :2019. - xxxv, 19 p. :ill., digital ;24 cm.
Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments.
This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s) Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC) Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC) These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.
ISBN: 9783030012229
Standard No.: 10.1007/978-3-030-01222-9doiSubjects--Topical Terms:
646361
Production control.
LC Class. No.: TS157
Dewey Class. No.: 658.56
Capacitated lot sizing problems in process industries
LDR
:04204nmm a2200325 a 4500
001
2178179
003
DE-He213
005
20190621132042.0
006
m d
007
cr nn 008maaau
008
191122s2019 gw s 0 eng d
020
$a
9783030012229
$q
(electronic bk.)
020
$a
9783030012212
$q
(paper)
024
7
$a
10.1007/978-3-030-01222-9
$2
doi
035
$a
978-3-030-01222-9
040
$a
GP
$c
GP
041
0
$a
eng
050
4
$a
TS157
072
7
$a
KJMV5
$2
bicssc
072
7
$a
BUS087000
$2
bisacsh
072
7
$a
KJMV5
$2
thema
082
0 4
$a
658.56
$2
23
090
$a
TS157
$b
.C236 2019
245
0 0
$a
Capacitated lot sizing problems in process industries
$h
[electronic resource] /
$c
by Ravi Ramya ... [et al.].
260
$a
Cham :
$c
2019.
$b
Springer International Publishing :
$b
Imprint: Springer,
300
$a
xxxv, 19 p. :
$b
ill., digital ;
$c
24 cm.
505
0
$a
Chapter 1. Introduction -- Chapter 2. CLSP: Real Life Applications and Motivation to Study Lot Sizing Problems in Process Industries -- Chapter 3. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods (CLSP:PCSC): Mathematical Model 1 (MM1) and A Heuristic for Process Industries -- Chapter 4. Further Development: Mathematical Model 2 (MM2) and A Comprehensive Heuristic for Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods for Peocess Industries -- Chapter 5. Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuming Sequencedependent Setup Times and Setup Costs (CLSP-SD-PCSC): Mathematical Models for Process Indusctries -- Chapter 6. Summary Concerning Theoretical Developments.
520
$a
This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s) Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC) Mathematical models are proposed which are all encompassing that they can handle continuous manufacturing (as in process industries), and also situations where the setup costs and holding costs are product dependent and time independent/time dependent, with possible backorders, and with other appropriate adaptations. Comprehensive heuristics are proposed based on these mathematical models to solve the CLSP-PCSC. The performance of the proposed models and heuristics are evaluated using problem instances of various sizes. This book also covers mathematical models developed for the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods, and with Sequence-Dependent Setup Times and Setup Costs (CLSP-SD-PCSC) These models allow the presence of backorders and also address real-life situations present in process industries such as production of a product starting immediately after its setup and its uninterrupted production carryover across periods, along with the presence of short/long setup times. Heuristics proposed for the CLSP-PCSC can be extended to address the CLSP problem with sequence dependent setup costs and setup times. All the models and heuristics proposed in this book address some real-life considerations present in process industries.
650
0
$a
Production control.
$3
646361
650
0
$a
Production control
$x
Mathematical models.
$3
757071
650
1 4
$a
Production.
$3
2203137
650
2 4
$a
Industrial and Production Engineering.
$3
891024
650
2 4
$a
Operations Research/Decision Theory.
$3
890895
700
1
$a
Ramya, Ravi.
$3
3382129
710
2
$a
SpringerLink (Online service)
$3
836513
773
0
$t
Springer eBooks
856
4 0
$u
https://doi.org/10.1007/978-3-030-01222-9
950
$a
Business and Management (Springer-41169)
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9368036
電子資源
11.線上閱覽_V
電子書
EB TS157
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入