How are Contractors Defining Design ...
~
Rangel, Cirilo I.
Linked to FindBook
Google Book
Amazon
博客來
How are Contractors Defining Design Assist.
Record Type:
Electronic resources : Monograph/item
Title/Author:
How are Contractors Defining Design Assist./
Author:
Rangel, Cirilo I.
Published:
Ann Arbor : ProQuest Dissertations & Theses, : 2017,
Description:
120 p.
Notes:
Source: Masters Abstracts International, Volume: 57-01.
Contained By:
Masters Abstracts International57-01(E).
Subject:
Architectural engineering. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10607570
ISBN:
9780355266030
How are Contractors Defining Design Assist.
Rangel, Cirilo I.
How are Contractors Defining Design Assist.
- Ann Arbor : ProQuest Dissertations & Theses, 2017 - 120 p.
Source: Masters Abstracts International, Volume: 57-01.
Thesis (M.Sc.B.C.M.)--Purdue University, 2017.
Large and complex building construction projects with critical schedule demands, call for early and thorough collaboration by the building team. This early collaboration, which has now extended to the specialty subcontractor level, provides timely analysis of many critical factors including performance, engineering, architecture, budget, schedule, site logistics, constructability, safety, quality, and lifelong operation and maintenance. Acting as a hybrid of Integrated Project Delivery, and the Design Build construction project delivery methods, Design-Assist, performed by the specialty subcontractor usually under the direction of the Construction Manager / General Contractor, is becoming increasingly popular.
ISBN: 9780355266030Subjects--Topical Terms:
3174102
Architectural engineering.
How are Contractors Defining Design Assist.
LDR
:03716nmm a2200349 4500
001
2156159
005
20180517123956.5
008
190424s2017 ||||||||||||||||| ||eng d
020
$a
9780355266030
035
$a
(MiAaPQ)AAI10607570
035
$a
(MiAaPQ)purdue:21731
035
$a
AAI10607570
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Rangel, Cirilo I.
$3
3343926
245
1 0
$a
How are Contractors Defining Design Assist.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2017
300
$a
120 p.
500
$a
Source: Masters Abstracts International, Volume: 57-01.
500
$a
Advisers: Bryan J. Hubbard; Mark Shaurette.
502
$a
Thesis (M.Sc.B.C.M.)--Purdue University, 2017.
520
$a
Large and complex building construction projects with critical schedule demands, call for early and thorough collaboration by the building team. This early collaboration, which has now extended to the specialty subcontractor level, provides timely analysis of many critical factors including performance, engineering, architecture, budget, schedule, site logistics, constructability, safety, quality, and lifelong operation and maintenance. Acting as a hybrid of Integrated Project Delivery, and the Design Build construction project delivery methods, Design-Assist, performed by the specialty subcontractor usually under the direction of the Construction Manager / General Contractor, is becoming increasingly popular.
520
$a
Since 2015, the ruling from Coughlin Electrical Constructors, Inc. vs. Gilbane Building Company, has seen courts rule on a sliding scale, the applicability of the Spearin Doctrine which for many years, had placed the risk of defects on the contract documents on the Owner. Coughlin (2015) states "The CMAR's level of participation in the design phase of the project and the extent to which the contract delegates design responsibility to the CMAR may affect a fact finder's determination as to whether the CMAR's reliance (on Owner documents) was reasonable." This variable of the extent is the basis of the sliding scale.
520
$a
The Design Bid Build delivery method utilized the customary roles of the Architect designing and the Contractor building. The contracts used for this delivery method enforced this approach. With Integrated Project Delivery and Construction Manager at Risk delivery methods now utilizing contractors in the design-assist role, this has caused an industry need to research and examine the need to revisit contract language when performing design-assist. As long as courts continue to consider the level of preconstruction participation on behalf of the specialty subcontractor, contractors performing design-assist may be unknowingly putting themselves at levels of risk typically found unacceptable.
520
$a
This study is meant to focus on design-assist and is intended to be the stepping-stone to future studies in design assist contracting. The purpose of this initial study is to better understand how contractors are defining design-assist and which scenarios best represent design-assist. The research was conducted using a mixed methods approach using an anonymous survey, which provided descriptive information. This study also asks if respondents have experienced negative results as the result of performing design-assist. At the respondent's option, semi-structured interviews were conducted with four respondents to learn more about their experiences and concerns performing design-assist.
590
$a
School code: 0183.
650
4
$a
Architectural engineering.
$3
3174102
650
4
$a
Architecture.
$3
523581
650
4
$a
Engineering.
$3
586835
690
$a
0462
690
$a
0729
690
$a
0537
710
2
$a
Purdue University.
$b
Construction Management Technology.
$3
3343765
773
0
$t
Masters Abstracts International
$g
57-01(E).
790
$a
0183
791
$a
M.Sc.B.C.M.
792
$a
2017
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10607570
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9355706
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login