Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Validating the Use of pPerformance R...
~
Holloman, Sherrica S.
Linked to FindBook
Google Book
Amazon
博客來
Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments./
Author:
Holloman, Sherrica S.
Published:
Ann Arbor : ProQuest Dissertations & Theses, : 2016,
Description:
192 p.
Notes:
Source: Dissertation Abstracts International, Volume: 77-08(E), Section: B.
Contained By:
Dissertation Abstracts International77-08B(E).
Subject:
Aerospace engineering. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10086217
ISBN:
9781339593500
Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments.
Holloman, Sherrica S.
Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments.
- Ann Arbor : ProQuest Dissertations & Theses, 2016 - 192 p.
Source: Dissertation Abstracts International, Volume: 77-08(E), Section: B.
Thesis (Ph.D.)--The George Washington University, 2016.
With pressure on the U.S. Defense Acquisition System (DAS) to reduce cost overruns and schedule delays, system engineers' performance is only as good as their tools. Recent literature details a need for 1) objective, analytical risk quantification methodologies over traditional subjective qualitative methods -- such as, expert judgment, and 2) mathematically rigorous system-level maturity assessments. The Mahafza, Componation, and Tippett (2005) Technology Performance Risk Index (TPRI) ties the assessment of technical performance to the quantification of risk of unmet performance; however, it is structured for component- level data as input. This study's aim is to establish a modified TPRI with systems-level data as model input, and then validate the modified index with actual system-level data from the Department of Defense's (DoD) Major Defense Acquisition Programs (MDAPs). This work's contribution is the establishment and validation of the System-level Performance Risk Index (SPRI). With the introduction of the SPRI, system-level metrics are better aligned, allowing for better assessment, tradeoff and balance of time, performance and cost constraints. This will allow system engineers and program managers to ultimately make better-informed system-level technical decisions throughout the development phase.
ISBN: 9781339593500Subjects--Topical Terms:
1002622
Aerospace engineering.
Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments.
LDR
:02292nmm a2200301 4500
001
2120570
005
20170724080044.5
008
180830s2016 ||||||||||||||||| ||eng d
020
$a
9781339593500
035
$a
(MiAaPQ)AAI10086217
035
$a
AAI10086217
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Holloman, Sherrica S.
$3
3282510
245
1 0
$a
Validating the Use of pPerformance Risk Indices for System-Level Risk and Maturity Assessments.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2016
300
$a
192 p.
500
$a
Source: Dissertation Abstracts International, Volume: 77-08(E), Section: B.
500
$a
Adviser: Steven M. F. Stuban.
502
$a
Thesis (Ph.D.)--The George Washington University, 2016.
520
$a
With pressure on the U.S. Defense Acquisition System (DAS) to reduce cost overruns and schedule delays, system engineers' performance is only as good as their tools. Recent literature details a need for 1) objective, analytical risk quantification methodologies over traditional subjective qualitative methods -- such as, expert judgment, and 2) mathematically rigorous system-level maturity assessments. The Mahafza, Componation, and Tippett (2005) Technology Performance Risk Index (TPRI) ties the assessment of technical performance to the quantification of risk of unmet performance; however, it is structured for component- level data as input. This study's aim is to establish a modified TPRI with systems-level data as model input, and then validate the modified index with actual system-level data from the Department of Defense's (DoD) Major Defense Acquisition Programs (MDAPs). This work's contribution is the establishment and validation of the System-level Performance Risk Index (SPRI). With the introduction of the SPRI, system-level metrics are better aligned, allowing for better assessment, tradeoff and balance of time, performance and cost constraints. This will allow system engineers and program managers to ultimately make better-informed system-level technical decisions throughout the development phase.
590
$a
School code: 0075.
650
4
$a
Aerospace engineering.
$3
1002622
650
4
$a
Management.
$3
516664
650
4
$a
Systems science.
$3
3168411
690
$a
0538
690
$a
0454
690
$a
0790
710
2
$a
The George Washington University.
$b
Engineering Management and Systems Engineering.
$3
3168968
773
0
$t
Dissertation Abstracts International
$g
77-08B(E).
790
$a
0075
791
$a
Ph.D.
792
$a
2016
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10086217
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9331188
電子資源
01.外借(書)_YB
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login