The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development./
作者:
Katz, Daniel Ross.
面頁冊數:
172 p.
附註:
Source: Dissertation Abstracts International, Volume: 75-06(E), Section: B.
Contained By:
Dissertation Abstracts International75-06B(E).
標題:
Engineering, System Science. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3612183
ISBN:
9781303734540
The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development.
Katz, Daniel Ross.
The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development.
- 172 p.
Source: Dissertation Abstracts International, Volume: 75-06(E), Section: B.
Thesis (Ph.D.)--The George Washington University, 2014.
Every year, the Department of Defense (DoD) invests billions of dollars on the development of major defense acquisition programs. In return, many of these weapon systems have been plagued with cost overruns and schedule delays during the Engineering and Manufacturing Development phase. Under conflicting guidance, DoD and the Government Accountability Office (GAO) suggest that weapon systems should contain subsystems with relatively mature technologies (based on the Technology Readiness Level of critical technologies) and mature designs (based on the percentage of releasable design drawings) during system development. However, there has been no published research to date on the relationship between technology and design maturity guidance and the resulting cost change and schedule change of DoD weapon systems. The research presented in this dissertation confirms that the GAO guidance for design maturity can lead to a reduction of cost change and schedule change of DoD weapon systems. In contrast, the research indicates that GAO technology maturity guidance only impacts the schedule change of weapon systems, and not the potential cost change. There is a lack of evidence to suggest that DoD guidance for maturity impacts the cost and schedule change of weapon systems realized in the development phase. With the quantitative results from the research, DoD and GAO officials can provide additional guidance to the planning and execution of the EMD phase, such as allocation of research and development funds to maturity achievement efforts.
ISBN: 9781303734540Subjects--Topical Terms:
1018128
Engineering, System Science.
The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development.
LDR
:02540nmm a2200277 4500
001
2055305
005
20141203121514.5
008
170521s2014 ||||||||||||||||| ||eng d
020
$a
9781303734540
035
$a
(MiAaPQ)AAI3612183
035
$a
AAI3612183
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Katz, Daniel Ross.
$3
3168950
245
1 4
$a
The Relationship of Technology and Design Maturity to DoD Weapon System Cost Change and Schedule Change During Engineering and Manufacturing Development.
300
$a
172 p.
500
$a
Source: Dissertation Abstracts International, Volume: 75-06(E), Section: B.
500
$a
Advisers: Shahram Sarkani; Thomas A. Mazzuchi.
502
$a
Thesis (Ph.D.)--The George Washington University, 2014.
520
$a
Every year, the Department of Defense (DoD) invests billions of dollars on the development of major defense acquisition programs. In return, many of these weapon systems have been plagued with cost overruns and schedule delays during the Engineering and Manufacturing Development phase. Under conflicting guidance, DoD and the Government Accountability Office (GAO) suggest that weapon systems should contain subsystems with relatively mature technologies (based on the Technology Readiness Level of critical technologies) and mature designs (based on the percentage of releasable design drawings) during system development. However, there has been no published research to date on the relationship between technology and design maturity guidance and the resulting cost change and schedule change of DoD weapon systems. The research presented in this dissertation confirms that the GAO guidance for design maturity can lead to a reduction of cost change and schedule change of DoD weapon systems. In contrast, the research indicates that GAO technology maturity guidance only impacts the schedule change of weapon systems, and not the potential cost change. There is a lack of evidence to suggest that DoD guidance for maturity impacts the cost and schedule change of weapon systems realized in the development phase. With the quantitative results from the research, DoD and GAO officials can provide additional guidance to the planning and execution of the EMD phase, such as allocation of research and development funds to maturity achievement efforts.
590
$a
School code: 0075.
650
4
$a
Engineering, System Science.
$3
1018128
650
4
$a
Business Administration, Management.
$3
626628
690
$a
0790
690
$a
0454
710
2
$a
The George Washington University.
$b
Engineering Mgt and Systems Engineering.
$3
1028210
773
0
$t
Dissertation Abstracts International
$g
75-06B(E).
790
$a
0075
791
$a
Ph.D.
792
$a
2014
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3612183
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9287784
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入