Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Economic production quantity models ...
~
Khursheed, Syed Naveed.
Linked to FindBook
Google Book
Amazon
博客來
Economic production quantity models with variable production rates.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Economic production quantity models with variable production rates./
Author:
Khursheed, Syed Naveed.
Description:
131 p.
Notes:
Source: Masters Abstracts International, Volume: 42-02, page: 0673.
Contained By:
Masters Abstracts International42-02.
Subject:
Engineering, System Science. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=1416271
Economic production quantity models with variable production rates.
Khursheed, Syed Naveed.
Economic production quantity models with variable production rates.
- 131 p.
Source: Masters Abstracts International, Volume: 42-02, page: 0673.
Thesis (M.S.)--King Fahd University of Petroleum and Minerals (Saudi Arabia), 2003.
This thesis focuses on Economic Production Quantity problem. The EPQ problem is concerned with the selection of the optimal production time for a production process. The literature in the area of EPQ focused more on either the selection of production rate or the production time. We have developed a mathematical model for the selection of optimal production time in case the production rate shifts to a value lower than the starting value for the case when this time to shift is deterministic. The second model is developed for the case when this time to shift is a random variable with known general distribution. The third model is an extension of the second model to include the possibility of restoration of the system to the original production rate in case a shift is detected during process inspection. The fourth model includes the possibility of preventive maintenance to reduce the effective age of the system to decrease the probability of shift. The fifth and final model extends the general model by relaxing the assumption of deterministic production rate after the shift. Results show that for the case where the production rate shifts, the expected cost per unit time will be forced higher and also the system is forced to operate for longer periods of time. The thesis is concluded by suggesting a number of recommendations for future research.Subjects--Topical Terms:
1018128
Engineering, System Science.
Economic production quantity models with variable production rates.
LDR
:02161nmm 2200253 4500
001
1864384
005
20041217072324.5
008
130614s2003 eng d
035
$a
(UnM)AAI1416271
035
$a
AAI1416271
040
$a
UnM
$c
UnM
100
1
$a
Khursheed, Syed Naveed.
$3
1951878
245
1 0
$a
Economic production quantity models with variable production rates.
300
$a
131 p.
500
$a
Source: Masters Abstracts International, Volume: 42-02, page: 0673.
502
$a
Thesis (M.S.)--King Fahd University of Petroleum and Minerals (Saudi Arabia), 2003.
520
$a
This thesis focuses on Economic Production Quantity problem. The EPQ problem is concerned with the selection of the optimal production time for a production process. The literature in the area of EPQ focused more on either the selection of production rate or the production time. We have developed a mathematical model for the selection of optimal production time in case the production rate shifts to a value lower than the starting value for the case when this time to shift is deterministic. The second model is developed for the case when this time to shift is a random variable with known general distribution. The third model is an extension of the second model to include the possibility of restoration of the system to the original production rate in case a shift is detected during process inspection. The fourth model includes the possibility of preventive maintenance to reduce the effective age of the system to decrease the probability of shift. The fifth and final model extends the general model by relaxing the assumption of deterministic production rate after the shift. Results show that for the case where the production rate shifts, the expected cost per unit time will be forced higher and also the system is forced to operate for longer periods of time. The thesis is concluded by suggesting a number of recommendations for future research.
590
$a
School code: 1088.
650
4
$a
Engineering, System Science.
$3
1018128
650
4
$a
Engineering, Industrial.
$3
626639
650
4
$a
Economics, Theory.
$3
1017575
690
$a
0790
690
$a
0546
690
$a
0511
710
2 0
$a
King Fahd University of Petroleum and Minerals (Saudi Arabia).
$3
1030607
773
0
$t
Masters Abstracts International
$g
42-02.
790
$a
1088
791
$a
M.S.
792
$a
2003
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=1416271
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9183259
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login