Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
A risk-based dynamic decision suppor...
~
Likhitruangsilp, Veerasak.
Linked to FindBook
Google Book
Amazon
博客來
A risk-based dynamic decision support system for tunnel construction.
Record Type:
Electronic resources : Monograph/item
Title/Author:
A risk-based dynamic decision support system for tunnel construction./
Author:
Likhitruangsilp, Veerasak.
Description:
503 p.
Notes:
Source: Dissertation Abstracts International, Volume: 64-02, Section: B, page: 0856.
Contained By:
Dissertation Abstracts International64-02B.
Subject:
Engineering, Civil. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3079489
A risk-based dynamic decision support system for tunnel construction.
Likhitruangsilp, Veerasak.
A risk-based dynamic decision support system for tunnel construction.
- 503 p.
Source: Dissertation Abstracts International, Volume: 64-02, Section: B, page: 0856.
Thesis (Ph.D.)--University of Michigan, 2003.
Efficient tunnel construction planning requires that contractors determine the optimal sequence of tunnel excavation methods and primary support systems based on available information. Important tunneling factors, including geologic uncertainty, uncertainty in the productivity of tunneling processes, the dynamics of tunneling operations, and a contractor's risk sensitivity influence a contractor's decisions significantly and must be addressed directly.Subjects--Topical Terms:
783781
Engineering, Civil.
A risk-based dynamic decision support system for tunnel construction.
LDR
:03397nmm 2200301 4500
001
1858325
005
20040927073706.5
008
130614s2003 eng d
035
$a
(UnM)AAI3079489
035
$a
AAI3079489
040
$a
UnM
$c
UnM
100
1
$a
Likhitruangsilp, Veerasak.
$3
1946020
245
1 0
$a
A risk-based dynamic decision support system for tunnel construction.
300
$a
503 p.
500
$a
Source: Dissertation Abstracts International, Volume: 64-02, Section: B, page: 0856.
500
$a
Chair: Photios G. Ioannou.
502
$a
Thesis (Ph.D.)--University of Michigan, 2003.
520
$a
Efficient tunnel construction planning requires that contractors determine the optimal sequence of tunnel excavation methods and primary support systems based on available information. Important tunneling factors, including geologic uncertainty, uncertainty in the productivity of tunneling processes, the dynamics of tunneling operations, and a contractor's risk sensitivity influence a contractor's decisions significantly and must be addressed directly.
520
$a
This dissertation develops a computerized risk-based dynamic decision support system that addresses the aforementioned issues by structuring a contractor's tunneling decisions as a risk-sensitive dynamic probabilistic decision process based on three interrelated models. The probabilistic geologic prediction model characterizes both uncertainty and variability of geologic conditions along the tunnel profile in the probabilistic form of ground class transitions. The probabilistic tunnel cost estimating model evaluates tunneling time and cost performance for different excavation and support methods as applied to different prevailing ground classes by using discrete-event simulation. The resulting ground class transition probabilities and tunneling unit costs determined by both models provide inputs for the risk-sensitive dynamic decision model. To capture a contractor's risk sensitivity, the tunneling unit costs are converted to a utility unit using the contractor's exponential utility function. Based on the assumption of constant risk aversion, the risk-sensitive stochastic dynamic programming model can be solved by using backward recursive fixing algorithm. The final outputs are optimal tunneling policies and estimated costs for the project, both of which reflect the contractor's risk preference. The results from applying the proposed system in a case study show that it can determine optimal tunneling policies and cost estimates as a function of a contractor's degree of risk sensitivity.
520
$a
The significance of this dissertation stems from the fact that it has accomplished several firsts. It incorporates uncertainty in both geologic prediction and performance of tunneling processes. It establishes a probabilistic estimating procedure based on a contractor's work breakdown structure. It is also the first system that can be used to systematically price the risk associated with tunneling and to investigate the effects of a contractor's risk preference on his optimal tunneling policies and cost estimates.
590
$a
School code: 0127.
650
4
$a
Engineering, Civil.
$3
783781
650
4
$a
Operations Research.
$3
626629
650
4
$a
Engineering, Mining.
$3
1035560
690
$a
0543
690
$a
0796
690
$a
0551
710
2 0
$a
University of Michigan.
$3
777416
773
0
$t
Dissertation Abstracts International
$g
64-02B.
790
1 0
$a
Ioannou, Photios G.,
$e
advisor
790
$a
0127
791
$a
Ph.D.
792
$a
2003
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3079489
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9177025
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login