語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Condition-based hazard rate estimati...
~
Jiang, Yong.
FindBook
Google Book
Amazon
博客來
Condition-based hazard rate estimation and optimal maintenance scheduling for electrical transmission system.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Condition-based hazard rate estimation and optimal maintenance scheduling for electrical transmission system./
作者:
Jiang, Yong.
面頁冊數:
148 p.
附註:
Source: Dissertation Abstracts International, Volume: 67-08, Section: B, page: 4597.
Contained By:
Dissertation Abstracts International67-08B.
標題:
Engineering, Electronics and Electrical. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3229087
ISBN:
9780542831881
Condition-based hazard rate estimation and optimal maintenance scheduling for electrical transmission system.
Jiang, Yong.
Condition-based hazard rate estimation and optimal maintenance scheduling for electrical transmission system.
- 148 p.
Source: Dissertation Abstracts International, Volume: 67-08, Section: B, page: 4597.
Thesis (Ph.D.)--Iowa State University, 2006.
The effectiveness of expending maintenance resources can vary dramatically depending on the target and timing of the maintenance activities. The objective of the work to develop a method of allocating economic resources and scheduling maintenance tasks among bulk transmission system equipment, so as to optimize the effect of maintenance with respect to the mitigation of component failure consequences. Techniques including condition-based failure rate estimation of electric transmission system components, analysis of failure consequences in power system, probabilistic modeling and risk assessment, and optimization are integrated in the work. Hidden Markov model is a good tool to estimate instantaneous status for deteriorating components. The maintenance selection and scheduling approach for bulk transmission equipment is based on the cumulative long-term risk caused by failure of each piece of equipment.
ISBN: 9780542831881Subjects--Topical Terms:
626636
Engineering, Electronics and Electrical.
Condition-based hazard rate estimation and optimal maintenance scheduling for electrical transmission system.
LDR
:02827nmm 2200289 4500
001
1832558
005
20070813115813.5
008
130610s2006 eng d
020
$a
9780542831881
035
$a
(UMI)AAI3229087
035
$a
AAI3229087
040
$a
UMI
$c
UMI
100
1
$a
Jiang, Yong.
$3
1030199
245
1 0
$a
Condition-based hazard rate estimation and optimal maintenance scheduling for electrical transmission system.
300
$a
148 p.
500
$a
Source: Dissertation Abstracts International, Volume: 67-08, Section: B, page: 4597.
500
$a
Adviser: James D. McCalley.
502
$a
Thesis (Ph.D.)--Iowa State University, 2006.
520
$a
The effectiveness of expending maintenance resources can vary dramatically depending on the target and timing of the maintenance activities. The objective of the work to develop a method of allocating economic resources and scheduling maintenance tasks among bulk transmission system equipment, so as to optimize the effect of maintenance with respect to the mitigation of component failure consequences. Techniques including condition-based failure rate estimation of electric transmission system components, analysis of failure consequences in power system, probabilistic modeling and risk assessment, and optimization are integrated in the work. Hidden Markov model is a good tool to estimate instantaneous status for deteriorating components. The maintenance selection and scheduling approach for bulk transmission equipment is based on the cumulative long-term risk caused by failure of each piece of equipment.
520
$a
This approach not only accounts for equipment failure probability and equipment damage, but it also accounts for the outage consequence in term of system related security problems. Various types of maintenance activities are studied and their relationship to the failure modes and system security improvement are investigated. An optimizer is developed to select and schedule the maintenance for large networks with various types of resource constraints, together with methods of resource reallocation.
520
$a
Finally, a strategy of incorporating maintenance activities among different transmission owners is developed. The objective of our work is to allocate resources economically and strategically so as to provide best performance of maintenance for electrical transmission system. These strategies can also be applied to problems inherent to resource intensive asset management in many similar types of infrastructures such as gas pipelines, airlines, and telecommunications.
590
$a
School code: 0097.
650
4
$a
Engineering, Electronics and Electrical.
$3
626636
690
$a
0544
710
2 0
$a
Iowa State University.
$3
1017855
773
0
$t
Dissertation Abstracts International
$g
67-08B.
790
1 0
$a
McCalley, James D.,
$e
advisor
790
$a
0097
791
$a
Ph.D.
792
$a
2006
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3229087
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9223422
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入