語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Sediment transport and channel adjus...
~
Cheng, Fang.
FindBook
Google Book
Amazon
博客來
Sediment transport and channel adjustments associated with dam removal.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Sediment transport and channel adjustments associated with dam removal./
作者:
Cheng, Fang.
面頁冊數:
113 p.
附註:
Source: Dissertation Abstracts International, Volume: 66-01, Section: B, page: 0421.
Contained By:
Dissertation Abstracts International66-01B.
標題:
Engineering, Civil. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3161126
ISBN:
9780496944231
Sediment transport and channel adjustments associated with dam removal.
Cheng, Fang.
Sediment transport and channel adjustments associated with dam removal.
- 113 p.
Source: Dissertation Abstracts International, Volume: 66-01, Section: B, page: 0421.
Thesis (Ph.D.)--The Ohio State University, 2005.
Dam removal has recently become one of the most controversial issues among the environmental society community in the United States. Release of reservoir sediment is the main uncertainty associated with this issue. This study has extensively documented the short-term changes in channel geometry, bed level profile, size distribution of substrates, and their relations with the sediment transport at the reach scale after a low-head dam removal.
ISBN: 9780496944231Subjects--Topical Terms:
783781
Engineering, Civil.
Sediment transport and channel adjustments associated with dam removal.
LDR
:03259nmm 2200337 4500
001
1824757
005
20061206120139.5
008
130610s2005 eng d
020
$a
9780496944231
035
$a
(UnM)AAI3161126
035
$a
AAI3161126
040
$a
UnM
$c
UnM
100
1
$a
Cheng, Fang.
$3
1029436
245
1 0
$a
Sediment transport and channel adjustments associated with dam removal.
300
$a
113 p.
500
$a
Source: Dissertation Abstracts International, Volume: 66-01, Section: B, page: 0421.
500
$a
Adviser: Tim C. Granata.
502
$a
Thesis (Ph.D.)--The Ohio State University, 2005.
520
$a
Dam removal has recently become one of the most controversial issues among the environmental society community in the United States. Release of reservoir sediment is the main uncertainty associated with this issue. This study has extensively documented the short-term changes in channel geometry, bed level profile, size distribution of substrates, and their relations with the sediment transport at the reach scale after a low-head dam removal.
520
$a
Before the complete removal, the structure was breached to de-water the reservoir. The suspended sediment concentration (SSC) and discharge downstream of the dam showed nearly no change during the breach. In contrast, the complete removal of the structure produced a sudden increase in downstream discharge and SSC. However, the amount of increase was insignificant compared to the annual rainfall event. The SSC within 10 months after the removal showed no significant difference with that of SSC before the removal.
520
$a
No bank erosion was evident at both upstream and downstream of the dam; while net deposition occurred downstream and net erosion occurred in the reservoir. Deposition and scouring were evident in the reservoir with overall decrease by 30% in bed slope. Deposition measurements showed up to a 20 cm increase in bed level downstream of the dam. Downstream bed materials size became at least 40% finer for post-removal conditions than for pre-removal conditions as a result of deposition of finer materials.
520
$a
High resolution Digital Elevation Models (DEMs) of the river bathymetry were generated from differential GPS surveys. The volume of deposition and erosion was computed from differencing the DEM for post-removal from the DEM for pre-removal. Compared with the observations, the transport rate estimated from the DEMs overestimated the transport rate within an order of magnitude.
520
$a
A 1-D hydrodynamic model, calibrated with the observations showed promising simulation results on the dynamics of dam removal and sediment transport. The major features described by the model were: (1) the magnitude and timing of the flood wave during the dam removal; and (2) the bed level adjustments after dam removal. Sensitivity analysis showed that the model was strongly dependent on the size distribution of the reservoir substrates.
590
$a
School code: 0168.
650
4
$a
Engineering, Civil.
$3
783781
650
4
$a
Engineering, Environmental.
$3
783782
650
4
$a
Geology.
$3
516570
690
$a
0543
690
$a
0775
690
$a
0372
710
2 0
$a
The Ohio State University.
$3
718944
773
0
$t
Dissertation Abstracts International
$g
66-01B.
790
1 0
$a
Granata, Tim C.,
$e
advisor
790
$a
0168
791
$a
Ph.D.
792
$a
2005
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3161126
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9215620
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入