地下水
Overview
Works: | 240 works in 53 publications in 53 languages |
---|
Titles
地下水觀測網及地層下陷防治綜合執行計畫 = = Intergration project on groundwater monitoring and land subsidence prevention /
by:
(Language materials, printed)
台灣地區地下水觀測站網水井攝影檢測及維護之先期研究 = = A pioneer study on the examination using well camera and maintenance for groundwater monitoring well network in Taiwan /
by:
(Language materials, printed)
地下水人工補注池設計原則探討 = = Design principles of A groundwater recharge pond /
by:
(Language materials, printed)
台灣地區地下水資源管理決策支援系統建置 = = The design supporting system for groundwater management in Taiwan(I) / . (一)
by:
(Language materials, printed)
人工湖法地下水補注試驗研究 = = Experimental research on the groundwater recharge of an artificial lake /
by:
(Language materials, printed)
台灣地區地下水觀測網整體計畫 = = Investigationand analyses of Groundwater quality in Lan-Yang plan andJienan plan : 地下水觀測網之建立及運作管理 : 蘭陽平原及嘉南平原地下水水質試驗分析研究 / . 八十九年度子計畫報告
by:
(Language materials, printed)
台灣地區地下水觀測網濁水溪沖積扇地下水水位之頻譜分析與初步擾動特性評估 = = Spectral analysis and preliminary disturbance evaluation of groundwater level in the Choshuihsi Alluvial Plain, Taiwan /
by:
(Language materials, printed)
水井攝影檢測技術應用於九二一集集大地震地下水觀測井井觀狀況調查 = = Application of television inspection system to investigate the status of groundwater monitoring well after the 921 Chi-Chi earthquake /
by:
(Language materials, printed)
濁水溪伏流水取水管設計原則之研究期末報告 = = The study of underground stream water collection system for Cho-Shui river fan /
by:
(Language materials, printed)
花東縱谷地下水調查研究 = = Study on groundwater resources inHua Lien-Tai Dong longitudinal valley /
by:
(Language materials, printed)
地下水觀測網成果彙整檢討及宣導推廣 = = Achievements compiled and development popularized of groundwater monitoring networks /
by:
(Language materials, printed)
台北盆地地下水管制區檢討及土壤液化評估 = = A review ofgroundwater restricted area and soil evaluation of soilliquefaction /
by:
(Language materials, printed)
地下水資源整體營運規劃與綜合評估 = = Assessment andmanagement of regional groundwater resources /
by:
(Language materials, printed)
台灣地區新建地下水觀測井之地下水水質試驗分析 = = Invetigation and Analysis of Groundwater Quality in Taiwan Area /
by:
(Language materials, printed)
台灣盆地地下水管制區檢討及土壤液化評估 = = A Review of Groundwater Restricted Area and Soil Evaluation of Soil Liquefaction /
by:
(Language materials, printed)
台灣地區新建地下水觀測井之地下水定年分析及垂向水質變化調查(3/4) = = Radiometric dating and vertical qualtiy variation of groundwater from wells inTaiwan area(3/4) /
by:
(Language materials, printed)
台中盆地做為地下水庫可能性之探討專題報告書 = = A study on the possibility of Tai-Chung basin as an underground-water reservoir /
by:
(Language materials, printed)
烏溪鳥嘴潭攔河堰初步規劃 = = Preliminary planning of Niaozueitan Weir in Wu River geological and regional groundwater investigation of weir site : 堰址地質及區域地下水調查 /
by:
(Language materials, printed)
屏東平原地下水環境復育計畫評估及監測系統規劃 = = The restoration of groundwater environment and monitoring planning system for Pingtung plain /
by:
(Language materials, printed)
臺灣山區地下水觀測網整體計畫先期研究 = = Pilot investigation for integrated planning of groundwater monitoring network in mountain regions of Taiwan /
by:
(Language materials, printed)
...年度地下水觀測網井體清洗及維護保養 = = Well development and maintenance of groundwater monitoring wells in 2007 /
by:
(Language materials, printed)
桃園地區地面地下水聯合管理整合模式評估與建構(1/2) = = The evaluation and development of integrated surface water and groundwater management model in Touyuan Area /
by:
(Language materials, printed)
地下水觀測網執行成效及發展規劃 = = The execution performance, development and planning of groundwater monitoring networks /
by:
(Language materials, printed)
大安大甲溪水資源聯合運用輸水隧道補充鑽探調查 = = Suppplemental boring investigation of the water conveyance tunnel by conjunctive use of Taan and Dajia rivers water resource /
by:
(Language materials, printed)
烏溪水源開發-烏溪鳥嘴潭攔河堰初步規劃 = = Water resource development for Wu River-preliminary planning of Niaozueitan Weir : topographic surveying, environmental and geological investigation : 測量暨環境、地質調查 / . (2)
by:
(Language materials, printed)
馬祖東莒大坪地下水庫初步規劃 = = Preliminary planning of Dongiu Daping groundwater reservoir /
by:
(Language materials, printed)
澎湖地區地下水資源調查規劃總報告(民國95-96年) = = Planning and investigation on ground water resources in Penghu region consolidated report(2006-2007) /
by:
(Language materials, printed)
馬祖地區地下水資源調查規劃總報告(民國95-96年) = = Planning and investigation on ground water resources in Matsu region consolidated report(2006-2007) /
by:
(Language materials, printed)
澎湖與馬祖地區地下水資源調查規劃(2) = = Planning and investigation on ground water resources in Penghu and Matsu region(2) /
by:
(Language materials, printed)
「97年度地下水觀測網井體清洗及維護保養成果報告」 = = Well development and maintenance of groundwater monitoring wells in 2008 /
by:
(Language materials, printed)
臺灣地區地下水質檢測分析與評估 = = Survey,analysis and assessment of groundwater quality in Taiwan areas in 2008 / . 97年度
by:
(Language materials, printed)
98年度台灣地區地下水質檢測分析與評估 = = Survey, analysis and assessment of groundwater quality in Taiwan areas in 2009 /
by:
(Language materials, printed)
地震地下水站網系統研發及技術成果導入 = = Development of tectono-hydrology monitoring system and application of the research results : 成果報告書 / . (4/4)
by:
(Language materials, printed)
臺中盆地地下水資源利用調查評估(1/3) = = Investigation and evaluation for groundwater resources utilization in Taichung basin(1/3) /
by:
(Language materials, printed)
蘭陽地區地面地下水調配及管理系統建置規劃 = = Establishment planning of the surface-ground water allocation and management system in Lan-Yang area /
by:
(Language materials, printed)
研訂鑿井技術參考手冊及行政管理作業要點(草案) = = Composing a technical and management guideline of well construction : (draft) : 總報告書 /
by:
(Language materials, printed)
研訂鑿井技術參考手冊及行政管理作業要點(草案) = = Composing a technical and management guideline of well construction : (draft) /
by:
(Language materials, printed)
地下水化學動力學與生態環境區劃分 = = Groundwater chemical kinetics and eco-environmental zonation /
by:
(Language materials, printed)
屏東縣林邊.佳冬.新園.枋山等四鄉鎮水井清查計畫 = = The well investigation of Linbian toenship ,Jiadong township ,Xinyuan township and Fangshan township in pingtung county /
by:
(Language materials, printed)
地層下陷防治智識建構及推廣計畫 = = 2010 The knowledge construction and publicity land subsidence prevention affairs / . 99年度
by:
(Language materials, printed)
違法水井處置作業規劃與量水設備設置推動計畫 = = The promotion project on processor to deal with illegal draft : Wells and regulations modified of discharge gauge /
by:
(Language materials, printed)
「100年度地下水觀測網井體清洗及維護保養」成果報告 = = Well development and maintenance of groundwater monitoring wells in 2011 /
by:
(Language materials, printed)
濁水溪水系地面水與地下水交互變動機制之研究 = = A study of interaction mechanism of surface and groundwater level variation at Zhuoshui River basin /
by:
(Language materials, printed)
氣候變遷下臺灣九大地下水資源區地下水潛能變化之研究 = = The investigation of groundwater potential variation under climate change in the nine groundwater resource regions of Taiwan (2/2) / . (2/2)
by:
(Language materials, printed)
臺灣地區乾旱時期地下水備援用水評估系統建置 = = Establishment of an evaluation system for groundwater resources as supportive water supply sources during the drought period in Taiwan. /
by:
(Language materials, printed)
地表地下水整合數值模式於地下水資源管理應用之研究 : = 濁水溪沖積扇與屏東平原總報告 = Applying integrated numerical modeling of surface water and subsurface water to study groundwater resources management-Zhuoshui River Alluvial Fan and Pingtung Alluvial Plain /
by:
(Language materials, printed)
地下水四維動態流場模型. = 濁水溪沖積扇 = The establishment of four-dimensional(4D) dynamic groundwater stream infomation system : Cho-Shui river alluvial fan(2/2) /. (2/2) :
by:
(Language materials, printed)
高屏與嘉南集水區地下水開發區位及其可開發量評估總報告 = = Assessment of groundwater potential exploiting zones and groundwater yields in Gaoping and Chianan Watersheds /
by:
(Language materials, printed)
雲彰地區水利工程之地下水補注功能調查及研析 = = The investigation of groundwater recharge potential of water conservancy projects in Yunlin and Changhua counties /
by:
(Language materials, printed)
高屏與嘉南集水區地下水開發區位及其可開發量評估 = = Assessment of groundwater potential exploiting zones and groundwater yields in Gaoping and Chianan watersheds. /
by:
(Language materials, printed)
地震與地下水文異常變化分析研究 = = Analysis and research of earthquake-induced anomalous groundwater hydrologic changes /
by:
(Language materials, printed)
高雄美濃地區地下水復育工程調查及規劃 = = Investigation and planning of groundwater rehabilitation project in Meinong,Kaohsiung /
by:
(Language materials, printed)
彙編「台灣地區地下水─濁水溪沖積扇篇」 = = Compilation "groundwater in Taiwan─Choushuichi Alluvial plain" /
by:
(Language materials, printed)
台北盆地地下水位變化對土壤液化之影響分析 = = Analysis of the impact of groundwater level on soil liquefaction in Taipei basin /
by:
(Language materials, printed)
台北盆地地下水水位變化對土壤液化之影響分析 = = Analysis of the impact of underground water level level changes on soil liquefaction in Taipei basin / . (III). ; III
by:
(Language materials, printed)
台灣地區新建地下水觀測井之地下水定年分析及垂向水質變化調查(1/4)暨台灣地區鑽井岩心沈積物及萃取液分析 = = Radiometric dating and vertical qualtiy variation of groundwater from wells in Taiwan area(1/4)(and analyses of core sediments and extractions : 嘉南平原(三)與蘭陽平原(一) /
by:
(Language materials, printed)
臺灣地區地下水觀測網水質監測調查分析 = = Groundwater quality of the Taiwan groundwater monitoring network /
by:
(Language materials, printed)
雲林縣臺西鄉現有水井調查與GPS定位 = = Investigation and mapping the groundwater well by GPS over Taixi area /
by:
(Language materials, printed)
濁水溪沖積扇地下水補注區之劃定及保育原則之研討 = = Delineation and preparation conservation principles forgroundwater recharge area in the Chou-Shui alluvial fan /
by:
(Language materials, printed)
臺灣沿海地區海水入侵之調查、評估與防治對策研擬 = = Study on the seawater intrusion in Taiwan area /
by:
(Language materials, printed)
台灣地區新建地下水觀測井之地下水水質試驗分析 = = Investigatin and Analysis of Groundwater Quality in Chu-Miao Area : 九十年度新苗區地下水水質試驗分析研究 /
by:
(Language materials, printed)
台灣地區地下水資源管理決策支援系統建置 = = The Design Supporting System for Groundwater Management in Taiwan /
by:
(Language materials, printed)
觀測井腐蝕改善之評估與規劃 = = Evaluation and planning forpreventing corrosion in the monitoring wells /
by:
(Language materials, printed)
地下水數值模式應用 = = Application of groundwater modeling : investigation ofpotential groundwater resources in the Fenglin area ofHualien county : 花蓮鳳林綜合開發區地下水可開瘦量研究 /
by:
(Language materials, printed)
地下水質量傳輸模式之發展與現地試驗研究 = = The development of groundwater masstransport model and in situ experiment /
by:
(Language materials, printed)
地震發生前後地下水水位異常變化研究整體推動計畫之研訂 = = Planning of groundwater anomalies associated with the earthquake /
by:
(Language materials, printed)
地震地下水站網系統研發及技術成果導入 = = Development of tectono-hydrology monitoring system and application of the research results /
by:
(Language materials, printed)
台灣地區地下水觀測網水質監測調查分析 = = Groundwater quality by the Taiwan groundwater monitoring network /
by:
(Language materials, printed)
高屏大湖開發營運方式與地下水位變化研究 = = The study on development, operation and groundwater level fluctuation of Gaoping Lake /
by:
(Language materials, printed)
蘭陽地區地面地下水聯合運用規劃 = = Conjunctive utilization of surface water with ground water for Lan-Yang area /
by:
(Language materials, printed)
知本溪、金崙溪流域地下水資源調查評估工作成果報告書 = = Investigation of groundwater resources in Chin-Ben and Jin-Lin Creek basins / . (1/2)
by:
(Language materials, printed)
地下水環境調查及分析作業先驅規劃 = = Precursory planning of groundwater environmental investigation and analysis / . (1/2)
by:
(Language materials, printed)
臺北盆地備用地下水井規劃 = = Development of groundwater reserve in Taipei Basin /
by:
(Language materials, printed)
蘭陽地區地面地下水調配及管理模式整合初步規劃 = = Preliminary planning of integrated surface-ground water allocation and management models for Lan-Yang area /
by:
(Language materials, printed)
花蓮馬鞍溪下游地下水井工程規劃 = = Planning of the wells in Hualian Ma-an River downstream area /
by:
(Language materials, printed)
廢污水處理回收補注地下水層再生利用之可行性先期研究計畫 = = Feasibility study for recharging aquifer with reclaimed wastewater /
by:
(Language materials, printed)
石門水庫後池改善初步規劃 = = Shihmen reservoir after bay improvement preliminary plan /
by:
(Language materials, printed)
桃園地區地面地下水聯合管理整合模式評估與建構(2/2) = = The evaluation and development of integrated surface water and groundwater management model in Touyuan Area / . (2/2)
by:
(Language materials, printed)
地震與地下水文異常變化分析研究. = Research on earthquake-induced anomalous changes in groundwater hydrology /. =(4/4) =
by:
(Language materials, printed)
區域尺度水力參數率定技術與地層異質性對人工湖規設之敏感度分析專題報告 = = Development of calibration technology for estimating regional-scale hydraulic properties and sensitivity analysis of the aquifer heterogeneity on the design and operation of artificial lake /
by:
(Language materials, printed)
馬祖東莒福正地下水庫初步規劃 = = Preliminary planning of Dongju Fucheng groundwater reservoir /
by:
(Language materials, printed)
台北盆地備用地下水井管理系統建置規劃 = = Administration system development and planning for backup groundwater wells in Taipei basin /
by:
(Language materials, printed)
地層下陷防治智識服務計畫 = = The intellectual project of land-subsidence prevention and reclamation /
by:
(Language materials, printed)
地層下陷防治智識建構及推廣計畫附件集 = = The knowledge construction and publicity for land subsidence prevention affairs /
by:
(Language materials, printed)
花蓮地區地面地下水聯合運用研究 = = Conjunctive utilizton of surface water with ground water for Hua-Lien area /
by:
(Language materials, printed)
地層下陷防治智識建構及推廣計畫附件集 = = 2010 the knowledge construction and publicity for land subsidence prevention affairs / . 99年度
by:
(Language materials, printed)
高屏大湖整體規劃檢討及分期推動策略研訂 = = A review of integarated planning and the development of the promoting strategy for gaoping lake /
by:
(Language materials, printed)
臺中盆地地下水資源利用調查評估 = = Investigation and evaluation for groundwater resources utilization in Taichung basin / . (2/3)
by:
(Language materials, printed)
地下水補注機制水力特性調查分析正式報告書 = = Investigation of hydraulic characteristics for groundwater recharge mechanism : 濁水溪沖積扇 : A case study on alluvial fan of Cho-Shui river / . (1/2)
by:
(Language materials, printed)
土壤及地下水污染整治十年有成專刊(2000-2010) = = Soil and groundwater pollution remediation-ten years on /
by:
(Language materials, printed)
設計及監造「99年度地下水觀測站井汰舊換新及維護」委託服務計畫成果報告 = = Design and construction supervision of the "replacement and maintenance of groundwater monitoring wells in 2010" result report /
by:
(Language materials, printed)
雲林內陸地層下陷地區地下水抽機制之探討與評估 = = The research and assessment of groundwater pumping mechanism in the land subsidence region of Yun-Lin /
by:
(Language materials, printed)
地下水補注機制水力特性調查分析 = = Investigation of hydraulic characteristics for groundwater recharge mechanism-A case study on alluvial fan of Cho-Shui river(2/2) : 濁水溪沖積扇 / . (2/2)
by:
(Language materials, printed)
水井合理抽汲水量及時間之探討 = = The analysis of reasonable potential discharge and puming time of well (1/2) / . (1/2)
by:
(Language materials, printed)
地下水觀測網及地層下陷防治精要成果彙集與展示 = = The Proposal of groundwater observation network and subsidence prevention results,collection and displays /
by:
(Language materials, printed)
台東地區地面地下水聯合運用可行性評估 = = Feasibility study on conjunctive utilization of surface water with ground water for tai-tung area /
by:
(Language materials, printed)
定常性地下水觀測網井體清洗及維護保養 = = Regular well cleaning and maintenance for groundwater monitoring networks in 2012 / . 101年度
by:
(Language materials, printed)
101至103年度地下水水質檢測分析與評估 = = Survey,Analysis and Assessment of Groundwater Quality of Taiwan in 2012-2014 / . (1/3)
by:
(Language materials, printed)
應用資料同化方法推估區域地下水利用之研究 = = Application of data assimilation method for regional groundwater utilization study /
by:
(Language materials, printed)
水井合理抽汲水量及時間之探討 = = The analysis of reasonable potential discharge and puming time of well (2/2) / . (2/2)
by:
(Language materials, printed)
氣候變遷下臺灣地區地下水資源補注之影響評估 = = Climate change impacts on Taiwan groundwater recharge /
by:
(Language materials, printed)
健全水井管理策略與查察管理技術提昇研究計畫 = = The study of integrated management strategies and advanced investigation and monitoring technologies for drafting wells / . (1/3)
by:
(Language materials, printed)
雲林地區公共用水井群最佳化操作方式之研究 = = The study on optimized operation of pumping well clusters for public use water in Yun-Lin /
by:
(Language materials, printed)
名竹盆地地下水源開發調查規劃 = = Investigation and planning of groundwater resource development on Minzu Basin / . 本文
by:
(Language materials, printed)
名竹盆地地下水源開發調查規劃 = = Investigation and planning of groundwater resource development on Minzu Basin / . 附錄
by:
(Language materials, printed)
台南大湖生態環境及地下水調查 = = Investigation of ecological environment and groundwater for Tainan Lake /
by:
(Language materials, printed)
鳥嘴潭人工湖設置對彰化地區地層下陷防治之研究 = = The Prevention of subsidence in Changhua area after the development of Niaozueitan Artificial Lake / . (2/2)
by:
(Language materials, printed)
鳥嘴潭人工湖設置對彰化地區地層下陷防治之研究總報告 = = The Prevention of subsidence in Changhua area after the development of Niaozueitan Artificial Lake general report /
by:
(Language materials, printed)
健全水井管理策略與查察管理技術提昇研究計畫 = = The study of integrated management strategies and advanced investigation and monitoring technologies for drafting wells / . (2/3)
by:
(Language materials, printed)
地表地下水整合性數值模式運用於地下水補注規劃 = = Planning groundwater recharge with coupled numerical models of surface and subsurface water /
by:
(Language materials, printed)
土壤及地下水污染整治年報 = = Soil and groundwater pollution remediation annual report / . 102年度
by:
(Language materials, printed)
氣候變遷下臺灣九大地下水資源區地下水潛能變化之研究 = = The Investigation of groundwater potential variation under climate change in the nine groundwater resources regions of taiwan (1/2) / . (1/2)
by:
(Language materials, printed)
地表地下水整合數值模式於地下水資源管理應用之研究(1/3) = = Applying integrated numerical modeling of surface water and subsurface water to study groundwater resources management (1/3) / . (1/3)
by:
(Language materials, printed)
濁水溪地下水智慧型預測模式之研究 = = Construction of intelligent groundwater prediction models for Jhuoshuei River basin /
by:
(Language materials, printed)
氣候變遷下臺灣九大地下水資源區地下水潛能變化之研究 = = The investigation of groundwater potential variation under climate change in the nine groundwater resource regions of Taiwan main report / . [3], . 總報告
by:
(Language materials, printed)
多含水層下黏彈塑性土層地層下陷數值模式建立之研究 = = Study on development of land subusidence numerical model for viscoelastic-plastic soil in multilayered aquifer system (2/2) / . (2/2)
by:
(Language materials, printed)
健全水井管理策略與查察管理技術提昇研究計畫 = = The study of integrated management strategies and advanced investigation and monitoring technologies for drafting wells (3/3) / . (3/3), . 三年期總成果報告
by:
(Language materials, printed)
地表地下水整合數值模式於地下水資源管理應用之研究 = = Applying integrated numerical modeling of surface water and subsurface water to study groundwater resources management (2/3) / . (2/3)
by:
(Language materials, printed)
健全水井管理策略與查察管理技術提昇研究計畫 = = The study of integrated management strategies and advanced investigation and monitoring technologies for drafting wells (3/3) / . (3/3)
by:
(Language materials, printed)
埔里盆地地下水資源調查開發評估 = Assessment of groundwater survey and development in Puli Basin /
by:
(Language materials, printed)
地下水四維動態流場模型-濁水溪沖積扇. = 正式報告書 = The Establishment of four-dimensional(4D)Dynamic groundwater stream information system: cho-shui river alluvial fan(1/2) /. (1/2) :
by:
(Language materials, printed)
地表地下水整合數值模式於地下水資源管理應用之研究. = Applying integrated numerical modeling of surface water and subsurface water to study groundwater resoures management(3/3) /. (3/3) =
by:
(Language materials, printed)
澎湖地區地下水海水入侵與防治措施評析 = = A quantitative investigation on sea water intrusions in the Penghu area and its related remediation strategy /
by:
(Language materials, printed)
臺灣地區地下水觀測網整體計畫成果彙編(81-105年) = = The Essential report of "Groundwater monitoring network plan, Taiwan"(1992-2016) /
by:
(Language materials, printed)
地下水補注機制水力特性調查分析先驅研究 = = Preliminary study of groundwater recharge processes and hydraulic properties investigation /
by:
(Language materials, printed)
河道伏流水取水布置試驗研究 = = Experiments on subsurface water intake configuration /
by:
(Language materials, printed)
地下水可用水量調查分析 : = 濁水溪沖積扇 = Analysis of available groundwater yield in Choushui river alluvial fan /
by:
(Language materials, printed)
動態地下水管理標準整合與枯旱度預測系統建置 : = 總報告 = Immediacy groundwater management level and prediction of groundwater drought index /
by:
(Language materials, printed)
時間域電磁法探討地下含水層 : = 以光復鄉大農大富平地森林園區為例 = Aquifer investigation using time-domain electromagnetic method – a case study of DaNongDaFu Forest Park in Hualien /
by:
(Language materials, printed)
知本溪、金崙溪流域地下水資源調查評估 = = Investigation of groundwater resources in Chin-Ben and Jin-Lin creek basins : 總報告 /
by:
(Language materials, printed)
臺灣地下水區可用水量調查分析及伏流水調查規劃先期作業成果報告 = = Reference manual of investigation and plan for hyporheic flow in taiwan (draft) / . 附冊三, . 臺灣地區伏流水調查規劃參考手冊(草案)
by:
(Language materials, printed)
屏東平原地下水分區邊界條件之研訂總報告度 = = Assessment of hydrological model boundary in PingTung Plain /
by:
(Language materials, printed)
臺中海線地區地下水資源綜合評估總報告書 = = Comprehensive assessment of groundwater resources in the coastal regions of Taichung /
by:
(Language materials, printed)
應用AI與大數據分析評估各用水標的抽水量總報告 = = Applying artificial intelligence and big data analytics in the estimation of groundwater withdrawals by different sectors /
by:
(Language materials, printed)
地層下陷防治推動計畫. = The Project for annual work plan of land-subsidence prevention and reclamation in 2022 /. 111年 =
by:
(Language materials, printed)
GPS固定站之規劃建置與觀測分析 = = Installation and analysis of GPS permanent station in 2007 /
by:
(Language materials, printed)
...年台灣地區地下水質檢測分析與評估計畫期末報告 = = Analysis and evaluation of the groundwater quality survey in Taiwan areas,2007 /
by:
(Language materials, printed)
知本溪、金崙溪流域地下水資源調查評估 = = Investigation of groundwater resources in Chin-Ben and Jin-Lin creek basins : 工作成果報告書 / . (2/2)
by:
(Language materials, printed)
地下水質檢測分析與評估 = = Survey,analysis and assessment of groudwater quality of Taiwan in2010 / . 99年度
by:
(Language materials, printed)
地下水觀測站網檢討及規劃 = = Review and planning for groundwater monitoring networks /
by:
(Language materials, printed)
彰化雲林地區地下水補注推動計畫 = = The Project of groundwater recharge for Changhua and Yunlin regions /
by:
(Language materials, printed)
地下水觀測網井體清洗及維護保養成果報告 = = Well development and maintenance of groundwater monitoring wells in 2010 / . 99年度
by:
(Language materials, printed)
鳥嘴潭人工湖設置對彰化地區地層下陷防治之研究 = = The prevention of subsidence in Changhua Area after the development of niaozueitan artificial lake / . (1/2)
by:
(Language materials, printed)
臺灣地下水區可用水量調查分析及伏流水調查規劃先期作業成果報告 = = Report of preliminary process of investigation planning for available yield of groundwater zones and hyporheic flow in taiwan /
by:
(Language materials, printed)
臺灣地下水區可用水量調查分析及伏流水調查規劃先期作業成果報告 = = Reference manual of investigation and analysis for available yield of groundwater zones in taiwan (draft) / . 附冊一, . 臺灣地下水區可用水量調查分析參考手冊(草案)
by:
(Language materials, printed)
臺灣地下水區可用水量調查分析及伏流水調查規劃先期作業成果報告 = = Plan of investigation and analysis for available yield of groundwater zones in taiwan (draft) / . 附冊二, . 臺灣地下水區可用水量調查分析計畫(草案)
by:
(Language materials, printed)
建置高屏溪地下水位查詢展示與預測模式 = = Construct a web-based query system and forecast models of groundwater levels for Gaoping river basin /
by:
(Language materials, printed)
離島區域家戶二元供水系統推動計畫規劃 : = 澎湖地區 = Planning of household dual water distribution system promotion project in Taiwan offshore island : Penghu area /
by:
(Language materials, printed)
用水調查統計暨地下水可用水量調查分析試辦計畫 = = Trail implementation plan for water use survey and analysis of available groundwater yield /
by:
(Language materials, printed)
新竹地區地下水可利用量補充調查規劃 = = Supplementary survey and planning of available groudwater yield in Hsinchu area /
by:
(Language materials, printed)
訊號分離技術應用於濁水溪沖積扇區域地下水文地質參數與抽補量推估 = = Application of signal decomposition techniques to estimate Hydrogeological parameters in Choushui River Alluvial Fan /
by:
(Language materials, printed)
濁水溪沖積扇地下水保育調配與即時水情預警模式建置 = = Conservation and allocation of groudwater resources and development of real-time alert level early warning system in Jhoushui River alluvial fan /
by:
(Language materials, printed)
應用地下水位序列分析於區域地下水文影響因子推估研究. = Application of time series analysis method to regional groudwater impact factor estimation research /. 1/2年 =
by:
(Language materials, printed)
地下水演算資料自動化前後處理與模組化分析 = = Modulized analysis of online pre and post processors for groundwater modeling data /
by:
(Language materials, printed)
Show more
Fewer
Subjects