Karim, Asim Salimul, (1971-)
概要
作品: | 1 作品在 0 項出版品 0 種語言 |
---|
書目資訊
Construction scheduling, cost optimization, and management = a new model based on neurocomputing and object technologies /
by:
Karim, Asim Salimul, (1971-); NetLibrary, Inc.; Adeli, Hojjat, (1950-)
(書目-語言資料,印刷品)